Laserfiche WebLink
INTERWEST — EVERETT CONTRACTOR'S YARD INTERIM FILL PROJECT Sitts & Hill Engineers, Inc. <br />CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN Job Number 17,733 <br />. Maintaining permit file on site at all times which includes the Construction SWPPP <br />and any associated permits and plans. <br />. Directing BMP installation, inspection, maintenance, modification, and removal. <br />• Updating all project drawings and the Construction SWPPP with changes made. <br />. Completing any sampling requirements including reporting results using <br />WebDMR. <br />- Keeping daily logs, and inspection reports. Inspection reports should include: <br />. inspection date/time. <br />. Weather information; general conditions during inspection and approximate <br />amount of precipitation since the last inspection. <br />. A summary or list of all BMPs implemented, including observations of all <br />erosion/sediment control structures or practices. The fbilowing shall be <br />noted: <br />1. Locations of BMPs inspected. <br />2. Locations of BMPs that need maintenance. <br />3. Locations of BMPs that failed to operate as designed or intended. <br />4. Locations of where additional or different BMPs are required. <br />. Visual monitoring results, including a description of discharged stormwater. <br />The presence of suspended sediment turbid water, discoloration, and oil <br />sheen shall be noted, as applicable. <br />• Any water quality monitoring performed during inspection. <br />- General comments and notes, including a brief description of any BMP <br />repairs, maintenance or installations made as a result of the inspection. <br />• Facilitate, participate in, and take corrective actions resulting from inspections per- <br />formed by outside agencies or the owner. <br />BMP C162: Scheduling <br />Purpose <br />Sequencing a construction project reduces the amount and duration of soil exposed to <br />erosion by wind, rain, runoff, and vehicle tracking. <br />Conditions of Use <br />The construction sequence schedule is an orderly listing of all major land -disturbing <br />activities together with the necessary erosion and sedimentation control measures <br />2014 Stormwater Management Manual for Western Washington <br />Volume 11 - Chapter 4 • Page 326 <br />SITTS & HILL ENGINEERS, INC. so <br />TACOMA, WASHINGTON <br />