My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 11:55:14 AM
Creation date
1/25/2022 8:36:00 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! A <br />EVERETT <br />WABNINWrON <br />Receipt # <br />X <br />Requested By: <br />Cost of Work Order <br />Puur tc Woms DEPARtMBNT <br />Utilities Division, 3200 Cedar Street <br />.Everett WA 98201 <br />425-257-8800 <br />.. c <br />Cost of Service Order $6963.00 <br />Sabrina Good <br />CoWactPerson Roy Swihart <br />Email Address: rayswlhart a@1nterwest,biz <br />Property Owner (name) ERT LLC <br />Date Paid <br />Work Order#i <br />Service Order f <br />Telephone # 360 899-9628 <br />Date of Request 6-1.2020 <br />Chai,ge Cost to (naMe if different than owner) Attn: Roy Swihart <br />Address 609 North Hill Blvd City . Burlington, WA zip 98233 <br />Installation Location 2320 Railway Ave <br />Installation type/description/size/etc, Connect existing 8" C.I. main to contractor installed 12 D.I. <br />wipe. City crew to install additional gate valve and hydrant at no cost, these are needed to address <br />a separate Issue. Cityc_r_ew(s) to excavate, shore and restore, <br />❑ The following estimate is rased upon the Utilities Division providing all labor, equipmei-tt, <br />materials, restoration, and final hook-up. <br />Please gotify the City of verett Utilities Division 10 working days lit advance of required installation <br />elate to allow for scheduling and parts procurement <br />Whenever the estimated coat is not sufficient to cover the total expense for labor; material, equipment rental and <br />Administrative costs, the deficit shall be charged to the property for which such installation was made mid the <br />owner thereof, and provided further, that any excess paymetit shall .be returned to the person applying for the <br />Installation. <br />"Deposit must be paid prior to ordering parts or scheduling work, <br />"Must have valid Public Works Permit before worle can be performed, <br />WATER METERS 4" AND LARGER MAYHAVE A SIX TO 10 WEEK LEAD TIME. <br />Material <br />$2666.00 <br />cc. 1314g,PennitCiMter <br />(LverettEPS@EverettWA,gov) <br />Labov and Benefits <br />$2380,00 <br />Matt Welborn - 8mail & I4C <br />Equilmient Rental <br />$732.00 <br />Dandy Allen - Entail <br />Jim Spooner - HC, <br />Tax <br />$206.00 <br />Sabrina Fandler - Entail <br />Re.4torafiou <br />Grant Moen - Entail <br />Thad Newport - Entail <br />TOTAL <br />$6963,00 <br />Erica Rose » Email <br />Prepared by: JimSpooner <br />! "� Date Estimate Prepared <br />2-11-2021 <br />Accepted by: . Roy W Swihart <br />Rels:`osentilig Interwest Construction Inc <br />CSTIMATia com IsOR G !MONTHS <br />S:UlCmm�tailalorlanflCost.osr12021\2320 R01my 12 111011001111 CBFP <br />1ofl <br />
The URL can be used to link to this page
Your browser does not support the video tag.