Laserfiche WebLink
p W i t,-� °-7 a4� <br />Construction Stormwater Pollution Prevention Plan <br />Interwest - Everett Contractor's Yard Interim Fill Project <br />Prepared for: <br />Interwest Construction, Inc. <br />609 North Hill Boulevard <br />Burlington, WA 98233 <br />Contact: Roy Swihart, VP <br />Phone: (360) 899-9628 <br />Prepared by: <br />Sitts & Hill Engineers, Inc. <br />4815 Center Street <br />Tacoma, Washington 98409 <br />Contact: Kathy Hargrave <br />Phone: (253) 474-9449 <br />Revised: November 2018 <br />Date: July 2018 Job No.17,733 <br />