Laserfiche WebLink
INTER WEST — EVERETT CONTRACTOR'S YARD INTERIM FILL PROJECT Sitts & Hill Engineers, Inc. <br />CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN Job Number 17,733 <br />Section 1— Project Description <br />This document is a Construction Stormwater Pollution Prevention Plan (CSWPPP) regarding the <br />proposed placement of fill on Snohomish County Parcel No. 29052100201000 (13.18 acres) in Everett, <br />WA in preparation for the construction of a contractor's yard. Figure 1 provides a vicinity map of the <br />project site. Per the requirements of the City of Everett, this CSWPPP has been prepared in accordance <br />with the standards of the 2012 Stormwater Management Manual for Western Washington as Amended <br />in December 2014 (DOE Manual). <br />Filling of the project site is proposed as an interim condition to allow work to begin on the 13.18 acre <br />site prior to the issuance of the final site development permit and the construction of the final site <br />condition. The proposed fill will be placed over the east 11.44 acres. The site will be stripped to a depth <br />of approximately 6 inches to 1 foot. Approximately 43,000 cubic yards of fill will be placed to raise the <br />finish grade of the site to an average elevation 18.50. The majority of site fill will be comprised of <br />readily -draining gravel. Temporary erosion and sediment control (TESC) measures are proposed to <br />accompany the filling of the site to prevent the loss of fill material and the pollution of stormwater <br />during the interim condition. See Section 7 of this CSWPPP for a description of the TESC measures that <br />will be installed and maintained throughout the duration of the interim condition, including silt fencing, <br />rock construction entrance, plastic covering over material stockpile, and a sediment trap. <br />SITTS & HILL ENGINEERS, INC. 3 <br />TACOMA, WASHINGTON <br />