My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 11:55:14 AM
Creation date
1/25/2022 8:36:00 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERWEST — EVERETT CONTRACTOR'S YARD INTERIM FILL PROJECT Sitts & Hill Engineers, Inc. <br />CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN Job Number 17,733 <br />Metal fiance I be designed and installed according to theWffd <br />' cifications. <br />Metal fences shall be at least high an be highly visible. <br />Fences shall not be wired or sta <br />Maintenance Sta s <br />spe- <br />If the fe s been damaged or visibility reduced, it shall be rep ' or replaced <br />jpwffately and visibility restored. <br />BMP C105: Stabilized Construction Entrance 1 Exit <br />Purpose <br />Stabilized Construction entrances are established to reduce the amount of sediment <br />transported onto paved roads by vehicles or equipment This is done by constructing a <br />stabilized pad of quarry spalls at entrances and exits for construction sites. <br />Conditions of Use <br />Construction entrances shall be stabilized wherever traffic will be entering or leaving a <br />construction site if paved roads or other paved areas are within 1,000 feet of the site. <br />For residential construction provide stabilized construction entrances for each residence, <br />rather than only at the main subdivision entrance. Stabilized surfaces shall be of suf- <br />ficient length/width to provide vehicle access/parking, based on lot size/configuration. <br />On large commercial, highway, and road projects, the designer should include enough <br />extra materials in the contract to allow for additional stabilized entrances not shown in <br />the initial Construction SWPPP. It is difficult to determine exactly where access to these <br />projects will take place; additional materials will enable the contractor to install them <br />where needed. <br />Design and Installation Specifications <br />See Figure 8-4.1.1 Stabilized Construction Entrance (P.273) for details. Note: the 100' <br />minimum length of the entrance shall be reduced to the maximum practicable size when <br />the size or configuration of the site does not allow the full length (100'). <br />Construct stabilized construction entrances with a 12-inch thick pad of 4-inch to 8-inch <br />quarry spalls, a 4-inch course of asphalt treated base (ATB), or use existing pavement <br />Do not use crushed concrete, cement, or calcium chloride for construction entrance sta- <br />bilization because these products raise pH levels in stormwater and concrete discharge <br />to surface waters of the State is prohibited. <br />2014 Stormwater Management Manual for Western Washington <br />Volume ll - Chapter 4 - Page 270 <br />SITTS & HILL ENGINEERS, INC. 25 <br />TACOMA, WASHINGTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.