My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 11:55:14 AM
Creation date
1/25/2022 8:36:00 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTER WEST — EVERETT CONTRACTOR'S YARD INTERIM FILL PROJECT Sitts & Hill Engineers, Inc. <br />CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN Job Number 17,733 <br />manent stabilization measures (such as pavement, riprap, gabions, or geotextiles) <br />which will prevent erosion. <br />Design and Installation Specifications <br />Seed retention/detention ponds as required. <br />Install channels intended for vegetation before starling major earthwork and hydroseed <br />with a Bonded Fiber Matrix. For vegetated channels that will have high flows, install <br />erosion control blankets over hydroseed. Before allowing water to flow in vegetated <br />channels, establish 75 percent vegetation cover. If vegetated channels cannot be estab- <br />lished by seed before water flow; install sod in the channel bottom —over hydromulch <br />and erosion control blankets. <br />. Confirm the installation of all required surface water control measures to prevent <br />seed from washing away. <br />. Hydroseed applications shall include a minimum of 1,500 pounds per acre of <br />mulch with 3 percent tackifier. See BMP C 121: Mulching (p.284) for specifications. <br />. Areas that will have seeding only and not landscaping may need compost or meal - <br />based mulch included in the hydroseed in order to establish vegetation. Re -install <br />native topsoil on the disturbed soil surface before application. <br />. When installing seed via hydroseeding operations, only about 113 of the seed actu- <br />ally ends up in contact with the soil surface. This reduces the ability to establish a <br />good stand of grass quickly. To overcome this, consider increasing seed quantities <br />by up to 50 percent. <br />Enhance vegetation establishment by dividing the hydromulch operation into two <br />phases: <br />1. Phase 1- Install all seed and fertilizer with 25-30 percent mulch and tackifier <br />onto soil in the first lift. <br />2. Phase 2- Install the rest of the mulch and tackifier over the first lift <br />Or, enhance vegetation by: <br />1. Installing the mulch, seed, fertilizer, and tackifier in one lift. <br />2. Spread or blow straw over the top of the hydromulch at a rate of 800-1000 <br />pounds per acre. <br />3. Hold straw in place with a standard tackifier. <br />Both of these approaches will increase cost moderately but will greatly improve <br />and enhance vegetative establishment. The increased cost may be offset by the <br />reduced need for: <br />2014 Stormwater Management Manual for Westem Washington <br />Volume 11 - Chapter - Page 279 <br />SITTS & HILL ENGINEERS, INC. 31 <br />TACOMA, WASHINGTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.