Laserfiche WebLink
Table of Contents <br />1. Project Overview...........................................................................................................................................1 <br />2. Minimum Requirements...............................................................................................................................2 <br />Minimum Requirement No. 1: Preparation of Stormwater Site Plans......................................................2 <br />Minimum Requirement No. 2: Construction Stormwater Pollution Prevention (SWPP) ..........................2 <br />Minimum Requirement No. 3: Source Control of Pollution......................................................................2 <br />Minimum Requirement No. 4: Preservation of Natural Drainage Systems and Outfalls ..........................2 <br />Minimum Requirement No. 5: On -Site Stormwater Management............................................................2 <br />Minimum Requirement No. 6: Runoff Treatment..................................................................................... <br />3 <br />Minimum, Requirement No. 7: Flow Control.............................................................................................4 <br />Minimum Requirement No. 8: Wetlands Protection.................................................................................4 <br />Minimum Requirement No. 9: Operation and Maintenance.....................................................................4 <br />3. <br />Existing Conditions Summary .....................................................................................................................4 <br />ExistingTopography.................................................................................................................................4 <br />SoilConditions..........................................................................................................................................4 <br />Native Protection Areas............................................................................................................................4 <br />4. <br />Off -Site Analysis...........................................................................................................................................4 <br />5. <br />Permanent Stormwater Control Plan.......................................................................................................... <br />5 <br />6. <br />Construction Stormwater Pollution Prevention Plan (SWPPP)............................................................... <br />5 <br />7. <br />Special Reports and Studies....................................................................................................................... <br />5 <br />8. <br />Other Permits................................................................................................................................................ <br />6 <br />List of Figures <br />Figure1-1: ............................................................................................................................................................. 2 <br />List of Tables <br />Table5-1: Project Area Summary........................................................................................................................5 <br />Appendices <br />AppendixA — Site Figures <br />• Al — Trail Designation Diagram <br />• A2 — Existing Conditions (Project Survey) <br />• A3 — Proposed Conditions (Project Grading and Drainage Plans) <br />Appendix B — Construction Stormwater Pollution Prevention Plan <br />Riverside Business Park — Port of Everett <br />Ili <br />