Laserfiche WebLink
IUBLICOVORKS PERMIT Date Applied: 4/11/2018 <br />City of Everett Permit Services Public Works Permit #: PW1804-024 <br />3200 Cedar Street, 2nd Floor Associated Bldg Permit #: <br />Everett, WA 98201 Planning Reference #: SMA18-003 <br />(425) 257-8810 Public Works Fee: $630.98 <br />2 7 AUG 2018 <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />EVERETT PORT OF <br />GRONEWALD ELISE / PORT OF EVERETT <br />1205 CRAFTSMAN WAY STE 200 <br />1205 CRAFTSMAN WAY STE 200 <br />EVERETT, WA 98201 <br />EVERETT, WA 98201 <br />PHONE: 4252593164 <br />PHONE: 4253880630 <br />TAX PARCEL ID #: <br />SITE ADDRESS: 600 BLOCK RIVERSIDE RD <br />DESCRIPTION: CONSTRUCT TRAILS AT RIVERSIDE BUSINESS PARK <br />Construction of 10-wide public access trails along Riverside Business Park. Segments included in these plans include <br />Segments C, D, J, K, & F, and viewpoints G and H. Landscaping along the shoreline and upland area are included in this <br />project. <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett `Design and Construction Standards <br />and Specifications for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 8/24/2018. <br />Approved plans must remain on job -site at all times. <br />5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction for a <br />consultation and to evaluate Erosion/Sedimentation control set-up. All inspections must be formally requested. See the <br />attached handout for phone number and online instructions to Request an Inspection. <br />6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upon <br />completion of the project prior to final approval of the permit. <br />7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br />8. Protect all existing underground utilities during construction. <br />9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be <br />managed on -site in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or <br />easements and the improvements located therein. <br />r this permit <br />10. This permit must be finaled in order to close out this permit. Call the inspection line to reques iZNUIR <br />when all items have been completed. <br />Public Works Permit Fee Breakdown: <br />AUG Z J ZO1S <br />Paving(29,196sf).............................................$145.98 <br />Grade/Fill/Excavate(2,OOOCY).........................$245.00 CITY CrF <br />Erosion Control <br />.................................................$200.00 PEVERETT <br />PW Plan Reviewermit Services <br />.................................................$20.00 <br />PW Site Inspection..............................................$20.00 <br />City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save <br />harmless the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of installation and <br />Q Aq019 <br />O <br />maintenance of the improvement or other right-of-way use here to applied <br />Approved for Construction (Public Works) Dat for and further agrees to remove same upon notice from the City and to <br />replace public property damagQed thherre¢y. <br />^n� <br />FINAL INSPECTION DateKp ^�c <br />Approved as Constructed (PW Inspector) Signature Qpplicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br />COMPLETEION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />