Laserfiche WebLink
NOTES: <br />r <br />0 <br />I1 <br />E <br />GRADING SECTIONS HAVE BEEN CREATED AT THE <br />SPECIFIED STATIONS NOTED FOR INDIVIDUAL TRAIL <br />SEGMENTS TO DEMONSTRATE CUT AND FILL <br />CONDITIONS AT EXISTING GRADE, AND TO <br />ILLUSTRATE THE FINAL PAVEMENT CROSS —SLOPE <br />DIRECTION. <br />REFER TO LAYOUT AND PAVING PLANS FOR THE <br />PAVEMENT SECTION REQUIREMENTS. <br />TRAIL K SECTION - STA 31 +00 2. TRAIL F SECTION - STA 35+001 <br />1"=10'HI1"=5'V 1"=10'HI1"=5'V C4.0 <br />TRAIL K SECTION - STA 30+10 2. TRAIL F SECTION - STA 34+00 2. <br />1"=16H1"=5'V 1"=10'H11"=5'V — <br />PROJECT ENGINEER: SCALE: DWG. NO. <br />=Ubl <br />11 PORT OF EVERETT1'o . Cis C. BORZIO AS SHOWNCi3■2 <br />poio ��4 DESIGNED RIVERSIDE BUSINESS PARK 3-0-031-01, <br />C. RAPP 03 23 2018 CIP NO. 3-0-022-01, <br />1601 Sth Avenue, Suite 1600 PUBLIC ACCESS TRAIL SEGMENTS C, D, 5-0-015-01 <br />Bmffff ltpff Seattle, WA 98101 DRAWN BY: CHECKED BY: <br />206.622.SM 82120 T. DEWITT A. CISNEROS F, J, AND K WITH VIEWPOINTS G AND H PROJECT <br />o NO. PA—RS-2018-02 <br />P.O. BOX 538 W .kpffx m Q 03.23.18 AGC 100% PERMIT SUBMITTAL °P� �s �`` .�+�`' APPROVED BY: TRAIL GRADING A N D <br />EVERETT, WA 98206 <br />(425) 259-3164 PROJECT NO. 1600312 140. — BY REVISION NO. DATE BY REVISION DRAINAGE SECTIONS SHEET NO. 29 of AQ <br />