Laserfiche WebLink
Construction Stormwater General Permit <br />Stormwater Pollution Prevention Plan <br />(SWPPP) <br />for <br />Riverside Business Park Public Access Trail <br />Segments C, D, F, J, and K with Viewpoints G and H <br />Prepared for: <br />The Washington State Department of Ecology <br />Northwest Regional Office <br />Permittee / Owner <br />Developer <br />Operator / Contractor <br />Port of Everett <br />N/A <br />I TBD <br />Everett, Washington <br />Certified Erosion and Sediment Control Lead (CESCL) <br />Name <br />Organization <br />Contact Phone Number <br />TBD <br />TBD <br />TBD <br />SWPPP Prepared By <br />Name <br />I Organization <br />I Contact Phone Number <br />Christopher Borzio, PE <br />I KPFF Consulting Engineers <br />1 (206) 622-5822 <br />SWPPP Preparation Date <br />March 9, 2018 <br />Project Construction Dates <br />Activity / Phase <br />Start Date <br />End Date <br />Trail Construction <br />August 2018 <br />December 2018 <br />