Laserfiche WebLink
2.1.7 Element 7: Protect Drain Inlets <br />List and describe BMPs <br />BMP C220: Storm Drain Inlet Protection per City of Everett Standard Drawing No 210 <br />Storm drain inlet protection will be used in the existing storm drains within the project site, as <br />well as all storm drains within 500 feet of the project. Storm drain protection shall remain in <br />place until project completion as determined by the owner. <br />Installation Schedules: Prior to earthmoving activity. <br />Inspection and Maintenance plan: Wet Season: Weekly and within 24 hours after heavy rainfall, <br />Dry Season: Monthly and within 24 hours after rainfall. Also, per current edition of City of Everett <br />Stormwater Management Manual. <br />Responsible Staff: CESCL <br />Page 112 <br />