Laserfiche WebLink
2.1.9 Element 9: Control Pollutants <br />The following pollutants are anticipated to be present on -site: <br />Table 2 — Pollutants <br />Pollutant (List pollutants and source, if applicable) <br />Diesel Fuel - Heavy equipment on site <br />Hydraulic Oil — Heavy equipment on site <br />List and describe BMPs: <br />All pollutants, including waste materials and demolition debris, that occur onsite shall be <br />handled and disposed of in a manner that does not cause contamination of stormwater. Good <br />housekeeping and preventative measures will be taken to ensure that the site will be kept clean, <br />well -organized, and free of debris. <br />Spill kits will be supplied and kept on site during construction. Employee orientation will include <br />instructions on spill prevention and clean up. <br />• BMP C140: Dust Control <br />Contractor shall control dust generated from construction activities. <br />• BMP C220: Storm Drain Inlet Protection per City of Everett Standard Drawing No 210 <br />Storm drain inlets vulnerable to stormwater discharge carrying dust, soil, or debris will be <br />protected using Storm Drain Inlet Protection. All storm drains within 500 feet of the site will be <br />protected. <br />Installation Schedules: Daily during heavy equipment work. <br />Inspection and Maintenance plan: Per current edition of City of Everett Stormwater <br />Management Manual. <br />Responsible Staff: CESCL <br />Will maintenance, fueling, and/or repair of heavy equipment and vehicles occur on -site? <br />® Yes❑ No <br />List and describe BMPs <br />Page 114 <br />