My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
600 RIVERSIDE RD 2022-01-25
>
Address Records
>
RIVERSIDE RD
>
600
>
600 RIVERSIDE RD 2022-01-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 1:20:04 PM
Creation date
1/25/2022 11:41:01 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
600
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
426
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.1.12 Element 12: Manage the Project <br />The project will be managed based on the following principles: <br />• Projects will be phased to the maximum extent practicable and seasonal work limitations <br />will be taken into account. <br />• Inspection and monitoring: <br />o Inspection, maintenance and repair of all BMPs will occur as needed to ensure <br />performance of their intended function. <br />o Site inspections and monitoring will be conducted in accordance with Special <br />Condition S4 of the CSWGP. Sampling locations are indicated on the Site Map. <br />Sampling station(s) are located in accordance with applicable requirements of <br />the CSWGP. <br />• Maintain an updated SWPPP. <br />o The SWPPP will be updated, maintained, and implemented in accordance with <br />Special Conditions S3, S4, and S9 of the CSWGP. <br />As site work progresses the SWPPP will be modified routinely to reflect changing site <br />conditions. The SWPPP will be reviewed monthly to ensure the content is current. <br />Table 5 — Manaaement <br />® <br />I Design the project to fit the existing topography, soils, and drainage patterns <br />® <br />Emphasize erosion control rather than sediment control <br />® <br />Minimize the extent and duration of the area exposed <br />® <br />Keep runoff velocities low <br />® <br />Retain sediment on -site <br />® <br />Thoroughly monitor site and maintain all ESC measures <br />® <br />Schedule major earthwork during the dry season <br />❑ <br />Other (please describe) <br />1 <br />it <br />u <br />1 <br />Page 119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.