My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
600 RIVERSIDE RD 2022-01-25
>
Address Records
>
RIVERSIDE RD
>
600
>
600 RIVERSIDE RD 2022-01-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 1:20:04 PM
Creation date
1/25/2022 11:41:01 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
600
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
426
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Review the SWPPP for compliance with Special Condition S9. Make appropriate <br />revisions within 7 days of the date the discharge exceeded the benchmark. <br />2. Immediately begin the process to fully implement and maintain appropriate source <br />control and/or treatment BMPs as soon as possible. Address the problems within 10 <br />days of the date the discharge exceeded the benchmark. If installation of necessary <br />treatment BMPs is not feasible within 10 days, Ecology may approve additional time <br />when the Permittee requests an extension within the initial 10-day response period. <br />3. Document BMP implementation and maintenance in the site log book. <br />If the turbidity exceeds 250 NTU or the transparency is 6 cm or less at any time, the following <br />steps will be conducted: <br />1. Telephone or submit an electronic report to the applicable Ecology Region's <br />Environmental Report Tracking System (ERTS) within 24 hours. <br />• Central Region (Benton, Chelan, Douglas, Kittitas, Klickitat, Okanogan, <br />Yakima): (509) 575-2490 or <br />http://www.ecy.wa.gov/programs/spills/forms/nerts online/CRO nerts online.html <br />• Eastern Region (Adams, Asotin, Columbia, Ferry, Franklin, Garfield, Grant, <br />Lincoln, Pend Oreille, Spokane, Stevens, Walla Walla, Whitman): (509) 329-3400 <br />or hftp://www.ecy.wa.gov/i3rograms/si3ills/f`orms/nerts online/ERO nerts online.html <br />• Northwest Region (King, Kitsap, Island, San Juan, Skagit, Snohomish, <br />Whatcom): (425) 649-7000 or <br />hftl?://www.ecy.wa.gov/programs/spills/forms/nerts online/NWRO nerts online.html <br />• Southwest Region (Clallam, Clark, Cowlitz, Grays Harbor, Jefferson, Lewis, <br />Mason, Pacific, Pierce, Skamania, Thurston, Wahkiakum,): (360) 407-6300 or <br />hftp://www.ecy.wa.gov/programs/spills/f`orms/nerts online/SWRO nerts online.html <br />2. Immediately begin the process to fully implement and maintain appropriate source <br />control and/or treatment BMPs as soon as possible. Address the problems within 10 <br />days of the date the discharge exceeded the benchmark. If installation of necessary <br />treatment BMPs is not feasible within 10 days, Ecology may approve additional time <br />when the Permittee requests an extension within the initial 10-day response period <br />3. Document BMP implementation and maintenance in the site log book. <br />4. Continue to sample discharges daily until one of the following is true: <br />• Turbidity is 25 NTU (or lower). <br />• Transparency is 33 cm (or greater). <br />• Compliance with the water quality limit for turbidity is achieved. <br />0 1 - 5 NTU over background turbidity, if background is less than 50 NTU <br />0 1 % - 10% over background turbidity, if background is 50 NTU or greater <br />• The discharge stops or is eliminated. <br />Page 125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.