Laserfiche WebLink
GENERAL NOTES: <br />/ 1. PROTECT AND VERIFY ALL EXISTING UTILITIES TO REMAIN. <br />/ 2. CONTRACTOR SHALL LOCATE ALL UTILITIES IN FIELD <br />/ - -- - - "'� BEFORE COMMENCING STREET WORK. NOTIFY PORT IF <br />/ ANY DISCREPANCIES ARE FOUND. <br />LOT P / 3. DUE TO SITE CONSTRAINTS FROM RIVER'S EDGE AND LOT <br />i s y IMPROVEMENTS, CONTRACTOR SHALL ACCOUNT FOR AND <br />\\ �" '`/"E' F" LIMITSr ' Gy BE FULLY RESPONSIBLE FOR SECURITY AND SAFETY OF <br />/ WORK, TYP)SITE. <br />�,f^fr. aP� INCLUDEJTHIS COST SR PART OFETH THE ON <br />��► <br />F ACTIVITIES AT NO ADDITIONAL COST TO THE PROJECT. <br />TEMPORARY SILT <br />a� � <br />214 <br />FENCE, (TYP) „,cv /� { "• xoo 4. REFER TO GEOTECHINCAL REPORT AND ENVIRONMENTAL <br />DOCUMENTS FOR RESTRICTIONS ON GRADING ACTIVITIES <br />ye. <br />v = ON OR AROUND ENVIRONMENTAL RREMED ATLON CAPS. <br />P d,, <br />- <br />y <br />r / „ ROTECTION,LE P <br />2'10 TRACT ACT D <br />/ � ,,,� � �� � CONSTRUCTION NOTES <br />r � � <br />1. TRACT D AREA NOTED WITHIN THE LIMITS OF WORK SHALL <br />/ BE CLEARED OF ALL VEGETATION TO ACCOMMODATE THE <br />- <br />/ MAINTAINED WHEREVER POSSIBLE 0 <br />p � TRAIL IMPROVEMENTS. <br />OTHERWISE IN THE AND <br />/ ' l <br />4 (TYP) MINIMIZE EEROSION.ADISTURBED LIMITS AREAS WITHIN THE <br />, <br />s-v�, ��-_ ; �� � � _ �� �� � � � WORK LIMITS AND OUTSIDE THE TRAIL AND LANDSCAPE <br />% "� HA BE PE TO PROTECT <br />J FROM <br />EROSION. ALL UTILITIES ABOVE AND BELOW GRADE <br />AR <br />CONTRACTOR'S-90RAAGE AREA 00 ;t >o FR M ER <br />- y, � SI:\ � -�_ � I F , _ <. � � %-/ SHALL BE PROTECTED UNLESS NOTED OTHERWISE. <br />2. TEMPORARY SILT FENCE MAY BE OMITTED ON THE LOT SIDES <br />IF EROSION IS NOT ANTICIPATED OR EXPECTED AND <br />rj / SURFACE AREA IS HIGHER THAN TRACT D, HOWEVER, <br />CONTRACTOR IS FULLY RESPONSIBLE TO PROTECT AND <br />EXCEPTION ` ` f� ' a r /♦� p �J` ' �l Oro <br />r i , \ / REPAIR ANY DAMAGES TO LOT IMPROVEMENTS PROPERTY <br />O �� �s �'� DURING THIS PROJECT CONSTRUCTION. <br />N <br />3. CATCH BASIN PROTECTION IS NOTED ON ALL STORM DRAIN <br />T .� STRUCTURES WITHIN TRACT D AREAS AND STREETS WHERE <br />i <br />NORTH CONSTRUCTION \ O 1 '-- 1 \ ' `ii APPLICABLE. HOWEVER, PROTECTION CAN BE OMITTED ON <br />(jDACCESS o STRUCTURES WITH SOLID COVERS. <br />PROPOSED TRAIL:'OUTLINE <br />/ - <br />® _ �� SHOWN FORaCOORDNATION` i <br />i <br />O o �► r - _ .. = � \ F � � 4. EXISTING MONITORING WELLS WITHIN THE WORK LIMITS SHALL <br />LOT 2 BE PROTECTED. REFER TO GRADING AND DRAINAGE PLANS <br />- — P h FOR ADJUSTMENTSIMPROVED SURFACE BY A QUALIFIED <br />O oo O o;=------ j /� y <br />To <br />APPROXIMATE EXIST <br />CONTRACTOR AS REQUIRED BY DOE. <br />GUARDRAIL LOCATION �r r <br />< 5. SILT FENCE LOCATION MAY BE MODIFIED BY CONTRACTOR TO <br />/ V` �\ ACCOMMODATE WORK METHODS. SILT FENCE SHOWN HERE <br />CHAIN LINK GATE AT CONTRACTOR'S DISCRETION \ f ` I <br />�` �' � IS CONCEPTUAL REFER TO NOTES 'TESC NOTES' FOR <br />r. <br />ADDITIONAL INFORMATION. <br />/ <br />6. NORTH CONSTRUCTION ACCESS NEAR TRAIL SEGMENT D <br />WILL REQUIRE REMOVAL, SALVAGE, AND REPLACEMENT OF <br />r <br />GUARD RAIL SYSTEM FOR ITS CONSTRUCTION. <br />0 10 20 40 <br />iggiiiw <br />1 inch a 20 feet <br />Call 811 PROJECT ENGINEER, Ste: PORT OF EVERETT DWG. NO. <br />• •twobusiness days ,o G. C1 C. BORZIO AS SHOWN C1.2 <br />Port o before you dig �w4 F 9 N DESIGNED BY: DATE: <br />C. RAPP 03 23 201$ RIVERSIDE BUSINESS PARK CIP NO. 3-0-031-01, <br />mm" ltpff 16015th Avenue, Suite 1600 w 3-0-022-01, <br />$eattle,WA98101 PUBLIC ACCESS TRAIL SEGMENTS C, D, s-o-o,s-o, <br />DRAWN BY: CHECKED BY: <br />206.622.58]2 32120 T. DEWITT A. CISNEROS F J AND K WITH VIEWPOINTS G AND H PROJECT <br />P.O. Box sae wot- ff.com Q �o„BdCrsrcR�O,�� ' ' NO. PA-RS-2018-02 <br />(425)EVERET, —3 98206 PROJECT N0. 1600312 O 034 8 ABC 100E PE�RSI� BMI1TAl NO. DA,E BY REVISION Bsg/ONl4 APPROVED �' SHEET NO. 13 OF 48 <br />(425) 259-3164 DEMOLITION, CLEARING AND TESC PLAN <br />