My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
600 RIVERSIDE RD Geotech Report 2022-10-25
>
Address Records
>
RIVERSIDE RD
>
600
>
Geotech Report
>
600 RIVERSIDE RD Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:59:32 PM
Creation date
1/25/2022 11:50:13 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
600
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />u <br />n <br />u <br />Landau Associates <br />5.0 USE OF THIS REPORT <br />LAI prepared this report for the exclusive use of KPFF and the Port of Everett for specific application to <br />the design of the proposed Riverside Business Park Public Access Trails and Roadway Improvements <br />project in Everett, Washington. Use of this report by others or for other projects is at the user's sole <br />risk. Within the limitations of scope, schedule, and budget, our services have been conducted in <br />accordance with generally accepted practices of the geotechnical engineering profession; no other <br />warranty, express or implied, is made as to the professional advice included in this report. <br />The conclusions and recommendations contained in this report are based in part upon the subsurface <br />data obtained from the explorations completed for this study. There may be some variation in <br />subsurface soil and groundwater conditions at the project site, and the nature and extent of the <br />variations may not become evident until construction. Accordingly, a contingency for unanticipated <br />conditions should be included in the construction budget and schedule. <br />If variations in subsurface conditions are encountered during construction, LAI should be notified for <br />review of the recommendations in this report, and revision of such if necessary. If there is a <br />substantial lapse of time between submission of this report and the start of construction, or if <br />conditions change due to construction operations at or adjacent to the project site, we recommend <br />that we review this report to determine the applicability of the conclusions and recommendations <br />contained herein. <br />We appreciate the opportunity to provide geotechnical services on this project and look forward to <br />assisting you during the construction phase of the project. If you have any questions or comments <br />regarding the information contained in this report, or if we may be of further service, please call. <br />Geotechnical Engineering Report 0121030.010.011 <br />Riverside Business Park March 22, 2018 <br />Public Access Trails and Roadway Improvements 5-1 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.