My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2720 ROCKEFELLER AVE 2022-01-31
>
Address Records
>
ROCKEFELLER AVE
>
2720
>
2720 ROCKEFELLER AVE 2022-01-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2022 9:13:39 AM
Creation date
1/25/2022 1:14:32 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2720
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASBESTOS NORTHWEST LLC SURVEY REPORT ASBESTOS , <br /> NORTHWEST <br /> 30620 Pacific Hwy S Suite 103 Federal Way,WA 98003 <br /> Tel:253 9414343 Fax:253 9414175 <br /> NASBNWEST Asbestos NW Batch# 202012857 <br /> 30620 Pacific Hwy S.#103,Federal Way,WA 98003 4 of 7 <br /> (253)941-4343 NVLAP Lab Code:200993-0 <br /> Bulk Samples Chain of Custody (EPA 600/R-93/116) <br /> Name/Company Ascendent LLC Date 7/21/2020 <br /> Address 219 12th St SE Puyallup.WA 98372 Phone 253.939.4375 <br /> ...,,. <br /> E-mail hestes@ascdemo.comSBova@ascdemo. <br /> Project Manager: Sean Bova Project# YMCA <br /> w_ <br /> Project Location: 2765 Rockefeller Ave Everett WA 98201 Number of Samples 204 <br /> Turn around time: 72 <br /> Sample ID Description Location/Comments <br /> 91 91 Texture 5th Floor NE Corner Room Wall <br /> 92 92 Joint Compound 5th Floor NE Big Room Wall <br /> 93 93 Texture 5th Floor East Room Wall <br /> 94 94 Joint Compound 5th Floor SW Room Wall <br /> 95 95 Texture 5th Floor South Room Wall <br /> 96 96 Joint Compound 5th Floor South Mid Room Wall <br /> 97 97 Texture 5th Floor SE Room Wall <br /> 98 98 Fibrous Ceiling Tile 5th Floor Hall Ceiling <br /> 99 99 Woven Red Wiring Insulation 5th Floor Bathroom Wall <br /> 100 100 Woven White Wiring Insulation 5th Floor Bathroom Wall <br /> 101 101 Woven Black Wiring Insulation 5th Floor Bathroom Wall <br /> 102 102 Black Tar Paper 5th Floor Bathroom Door Opening <br /> 103 103 Yellow Backsplash and Mastic 5th Floor Kitchen Wall <br /> 104 104 White Brittle Pipe Wrap 5th Floor Kitchen Wall <br /> 105 105 Yellow Fibrous Insulation 5th Floor Utility Room Pipe <br /> 106 106 White Brittle Pipe Wrap 5th Floor Utility Room Pipe Elbow <br /> 107 107 Green Vinyl Tile and Black Mastic 4th Floor SW Room <br /> 108 108 Red Vinyl Tile and Black Mastic 4th Floor South Mid Room <br /> 109 109 Brown Vinyl Tile and Black Mastic 4th Floor East Hall <br /> 110 110 Plaster 4th Floor West Room Wall <br /> 111 111 Plaster 4th Floor Hall Wall <br /> 112 112 Plaster 4th Floor SE Room Wall <br /> 113 113 Plaster 4th Floor Bath Ceiling <br /> 114 114 Plaster 4th Floor East Mid Room <br /> 115 115 Plaster 4th Floor East North Room <br /> 116 116 Plaster 4th Floor North Corner Room <br /> 117 117 Fibrous Ceiling Tile 4th Floor Hall Ceiling <br /> 118 118 Black Asphalic Paint on Wood 4th Floor Window Opening <br /> 119 119 Woven Black Wiring Insulation 4th Floor Bathroom <br /> 120 120 White Brittle Pipe Wrap 4th Floor Bathroom Pipe Elbow <br /> Print Sign Company Date Time <br /> Sampled by: Sean Butler 7/16/2020 <br /> Relinquished by: <br /> Asbestos <br /> Delivered by: Sean Butler 4t 7/21/2020 8 OOAM <br /> Accepted by: Dan Lafley � N <br /> \/'tj 7/21/2020 8.00AM <br /> Analyzed by: - <br /> 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.