My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2902 RUCKER AVE 2022-01-25
>
Address Records
>
RUCKER AVE
>
2902
>
2902 RUCKER AVE 2022-01-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 2:28:18 PM
Creation date
1/25/2022 2:27:11 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2902
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/3/2021 Page —W. <br /> City of Everett <br /> 6:34:14AM /' <br /> INSPECTION ACTIVITY REPORT -'"s/ <br /> Permit No. M2101-050 Site Address 2902 RUCKER AVE <br /> Applied 1/15/2021 Applicant Lot <br /> Approved 12/30/2020 Owner DMT RUCKER LLC Block <br /> Issued 1/27/2021 Contractor COMFORT SYSTEMS USA(NW)INC Tract <br /> Parent Permit No. B2003-043 Description INSTALL HVAC FOR NEW OFFICES FROM PKG GARAGE <br /> Notes SUBJECT TO FIELD INSPECTION <br /> "OTHER MECH-6 GRD'S,9 ROOF HOODS" <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> MECH 04-ROUGH MPI eTRAKiT Inspection 11/10/2021 3:02 PM Tim Irvin <br /> IN Request ceiling cover, <br /> Contact Name:Tim Irvin <br /> Site Address:2902 RUCKER AVE <br /> Phone:3603178125 <br /> e-Mail:ocg.11c@yahoo.com <br /> 3/10/2021 3/10/2021 MECH 05-OTHER SDP OTHER discription of work/ (3/30/2021 10:02 AM SDP) <br /> this permit This permit covers Rooftop units being <br /> added,gas pipe and mech on 2nd floor and <br /> garage levels. <br /> 3/10/2021 3/10/2021 GAS 01-ROUGH IN TAHU APPROVAL discription of work/ 3/8/2021 3:15 PM Bryan Cooley <br /> this permit <br /> Contact Name:Bryan Cooley <br /> Site Address:2902 RUCKER AVE <br /> Phone:4252469180 <br /> e-Mail:bcooley@csusanw.com <br /> (3/10/2021 2:20 PM TAHU) <br /> this mechanical permit is for the new <br /> rooftop units,the second floor and garage <br /> portion of the building, <br /> Gas line is going up the side of building <br /> on to the roof, To roof top units(RTU <br /> 1,4,5,6,)Hot water tanks and a couple unit <br /> heaters in the second floor And a range. <br /> rough in ok <br /> Call for inspection for final <br /> 3/18/2021 3/18/2021 MECH 04-ROUGH TAHU PARTIALAPPR see notes 3/17/2021 3:20 PM Zack McGinnis <br /> IN <br /> Contact Name:Zack McGinnis <br /> Site Address:2902 RUCKER AVE <br /> Phone:4254718115 <br /> e-Mail:Zmcginnis@csusanw.com <br /> (3/29/2021 3:42 PM TAHU) <br /> RTU set in place on curbs and units on the <br /> second floor installed with the exhaut vents <br /> running out the roof, <br /> Call for inspection for all duct work in <br /> second floor and shaft,and kichen hood.( <br /> for rough in) <br /> 3/29/2021 3/29/2021 GAS 03-FINAL TAHU APPROVAL (3/29/202I 3:34 PM TAHU) <br /> final ok <br /> test gauge left on the dirt leg on unit heat <br /> on second floor <br /> 7/26/2021 7/26/2021 PERMIT KLC EXTENSION A COVID <br /> EXTENSION EXTENSION <br /> INSP12 CRWS STEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.