Laserfiche WebLink
1/4/2022 Page 1 <br /> City of Everett <br /> 6:14:31AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2108-106 Site Address 320 89TH ST SE <br /> Applied 8/12/2021 Applicant Asfaw Belay Lot <br /> Approved 8/13/2021 Owner Asfaw Belay Block <br /> Issued 8/13/2021 Contractor Asfaw belay Tract <br /> Parent Permit No. B2012-042 Description Adding outlet and rewire <br /> Notes Adding outlet and rewire <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 8/17/2021 8/17/2021 ELEC 06-ROUGH MCB CORRECTION eTRAKiT Inspection 8/15/2021 9:19 PM Asfaw Belay <br /> IN Request <br /> Contact Name:Asfaw Belay <br /> Site Address:320 89TH ST SE <br /> Phone:2063544095 <br /> e-Mail:asfaw08@gmail.com <br /> (8/17/2021 10:49 AM MCB) <br /> mcb changed Inspection Type from ELEC <br /> 08-OTHER to ELEC 06-ROUGH IN <br /> (8/17/2021 3:18 PM MCB) <br /> Ok seals in main panel,nail plates.Heat <br /> pump disconnect missing dead front and ko <br /> seals for final <br /> 8/19/2021 8/19/2021 ELEC 06-ROUGH SKB NOT READY eTRAKiT Inspection 8/18/2021 1:52 PM Asfaw Belay <br /> IN Request <br /> Contact Name:Asfaw Belay <br /> Site Address:320 89TH ST SE <br /> Phone:2063544095 <br /> e-Mail:asfaw08@gmail.com <br /> (8/19/2021 10:15 AM SKB) <br /> Reschedule electrical inspection after plan <br /> revisions have been submitted and <br /> approved. <br /> 9/14/2021 9/14/2021 ELEC 06-ROUGH MCB APPROVAL eTRAKiT Inspection 9/13/2021 3:02 PM Asfaw Belay <br /> IN Request <br /> Contact Name:Asfaw Belay <br /> Site Address:320 89TH ST SE <br /> Phone:2063544095 <br /> e-Mail:asfaw08@gmail.com <br /> (9/14/2021 2:09 PM MCB) <br /> Ok rough in note:discussed panel cover <br /> must be flush with panel can owner <br /> removing 2x2 and installing rigid insulation <br /> for final <br /> 12/21/2021 12/21/2021 ELEC 09-FINAL MCB CORRECTION eTRAKiT Inspection 12/20/2021 2:11 PM Asfaw Belay. <br /> Request <br /> Contact Name:Asfaw Belay <br /> Site Address:320 89TH ST SE <br /> Phone:2063544095 <br /> e-Mail:asfaw08@gmail.com <br /> (12/21/2021 3:32 PM MCB) <br /> Finish panel schedule correctly and install <br /> afci and gfci per code <br /> INSP 12 <br /> Cr _ _ S YE,TE S <br />