My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Transportation 10/29/2021
>
Contracts
>
6 Years Then Destroy
>
2023
>
WA ST Dept of Transportation 10/29/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2022 2:05:55 PM
Creation date
1/28/2022 2:05:12 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Transportation
Approval Date
10/29/2021
Council Approval Date
10/20/2021
End Date
6/30/2023
Department
Transportation Services
Department Project Manager
Melinda Adams
Subject / Project Title
Green Transportation Grant Program
Public Works WO Number
PTD0465
Tracking Number
0003163
Total Compensation
$480,000.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of <br /> N <br /> O <br /> but not limited to, interim and annual reports. The CONTRACTOR shall keep satisfactory written <br /> records with regard to the use of Project and shall submit the following reports to, and in a form and <br /> at such times prescribed by WSDOT as set forth in the Guidebook, and any subsequent <br /> amendments thereto: <br /> 1. A draft Performance Measurement Plan (PMP) must be submitted to WSDOT before <br /> submitting the first reimbursement request. If the contractor does not submit a PMP and is <br /> nonresponsive to requests from WSDOT for improvements and information, the contractor may be <br /> deemed out of compliance. <br /> 2. An Annual Performance Report that includes a summary of overall project performance and <br /> supporting data. <br /> 3. Reports describing the current usage of the Project and other data which WSDOT may <br /> request from the CONTRACTOR by memos, e-mails or telephone requests. <br /> 4. In the event any portion of the Project sustains disabling damage, the CONTRACTOR shall <br /> notify WSDOT immediately after the occasion of the damage, including the circumstances thereof. <br /> 5. The CONTRACTOR shall collect and submit to WSDOT, at such time as WSDOT may <br /> require, such financial statements, data, records, contracts, and other documents related to the <br /> Project as may be deemed necessary by WSDOT. <br /> C. Remedies for Misuse or Noncompliance. If WSDOT determines that the Project has <br /> been used in a manner materially different from Section 1, WSDOT may direct the CONTRACTOR <br /> to repay WSDOT the State funded share of the Project. WSDOT may also withhold payments <br /> should it determine that the CONTRACTOR has failed to materially comply with any provision of <br /> this AGREEMENT. <br /> Section 14 <br /> Maintenance of the Project <br /> The CONTRACTOR shall make all necessary repairs and reasonably maintain the Project to assure <br /> it remains in good and operational condition until the end of its useful life. The useful life of a <br /> constructed project is determined based on the Architectural/Engineering requirements for each <br /> type of structure, materials used, industry standards, and other federal and/or state standards and <br /> specifications. All service, materials, and repairs in connection with the use and operation of the <br /> Project during its useful life shall be at the CONTRACTOR's expense. CONTRACTORS who are <br /> transit agencies must also have a Transit Asset Management Plan certified by WSDOT that details <br /> the transit agency's plan to maintain the Project. All other CONTRACTORS must submit a written <br /> Maintenance Plan to WSDOT for approval prior to the occupation and/or operations of the Project. <br /> The CONTRACTOR agrees, at a minimum, to maintain the Project and service or replace parts at <br /> intervals recommended in the manuals and/or instructions provided by the subcontractors and/or <br /> component manufacturers, or sooner if needed. The CONTRACTOR shall have the Project <br /> routinely inspected and make arrangements for any appropriate service and repair under the <br /> manufacturer's warranty, if applicable. WSDOT shall not be liable for repairs. The CONTRACTOR <br /> shall retain records of all maintenance and parts replacement performed on the Project in <br /> accordance with Section 22, Audits, Inspection, and Retention of Records. The CONTRACTOR <br /> shall provide copies of such records to WSDOT, upon request. <br /> Section 15 <br /> Compliance with State Design Standards <br /> The CONTRACTOR agrees the Project design must comply with all applicable Washington State <br /> Standard Specifications for Road, Bridge, and Municipal Construction, and any applicable revisions <br /> thereto. Projects that wish to use design standards that differ from state standards must submit a <br /> request to WSDOT's Public Transportation Division and obtain documented approval before design <br /> work commences. <br /> V <br /> H <br /> l7 <br /> Everett Transit 6 of 15 <br /> PTDD465 <br />
The URL can be used to link to this page
Your browser does not support the video tag.