Laserfiche WebLink
construction of the transitional housing is approximately 5 years away, there is more than <br /> adequate time to plan and obtain the funding necessary for construction. <br /> The Executive Director of the Everett Housing Authority, in a letter addressed to DVS <br /> dated March 2, 2009 indicated that the Housing Authority fully supports your plans for <br /> provision of a new shelter together with administrative and supportive services for victims <br /> of domestic violence. "We further support the inclusion in your plans of a small transitional <br /> housing development at the 12th Street end of the property. <br /> "Our Board of Commissioners has formally agreed to serve as the lessee and developer of <br /> the transitional units. Our expectation is that the site would be leased to EHA (or to an <br /> entity controlled by EHA) and we would develop, own and manage the units. It would be <br /> our expectation to "project-base" vouchers at the site, utilizing the allocation already <br /> awarded to DVS as part of the Sound Families program, and supplementing them with <br /> adequate additional vouchers to cover all of the units. Using this approach will serve two <br /> important purposes: first, it would make the units affordable to the tenants, all of whom will <br /> be referred by DVS from the shelter; second, it would provide a secure source of rental <br /> income, using market rental rates, in order to satisfy a lender. <br /> "Since the site will not be vacated by the Army for three years, it is not possible to secure <br /> commitments at this time. The current weakened state of the credit market together with <br /> the focus of normal housing funders on "shovel ready" projects contribute to this situation. <br /> However, the transitional housing element of the proposal is modest in size and should not <br /> present any significant obstacles to completion. The generous lead time available should <br /> be of great assistance in putting the development and financing package together. <br /> "We are excited about your progress in this effort and look forward to working with you to <br /> make this entire undertaking a reality." <br /> 5. Proposed Financial Plan to Operate and Maintain Proposed Project <br /> The preliminary projections of the cost to acquire, remodel, develop, furnish and cover <br /> contingency expenses and equipment are as follows: <br /> *Capital Project Other <br /> Land acquisition $0.0 Fundraising (2006-2011) $0.8 <br /> Construction 2.8 3-Year Program Expansion (consistent with <br /> Development 1.0 Growth projected in strategic plan) 0.5 <br /> Project Contingency 0.9 Transition and start-up costs 0.1 <br /> Furnishings & Equipment 0.3 Overall project contingency (— 2%) 0.1 <br /> Sub-total Capital Project 5.0 Sub-total Other 1.5 <br /> Total Expenses $6.5 *(All figures are presented in millions) <br /> NOTE: The market value of the Oswald site with its acreage and existing buildings is not <br /> known. Based on preliminary work done to date, it may cost$3.0-$5.0 M more to acquire land <br /> and build "from scratch"on another property comparable to the size and location of the Oswald <br /> Center. The difference in cost for new construction rather than renovation of existing structures <br /> is factored in to this projection. <br /> 8 <br />