My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Neptune General Contractors 1/25/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2022
>
Neptune General Contractors 1/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 10:19:54 AM
Creation date
2/11/2022 10:12:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Neptune General Contractors
Approval Date
1/25/2022
Council Approval Date
12/15/2021
End Date
5/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovation
Public Works WO Number
PW2021-072
Tracking Number
0003186
Total Compensation
$419,650.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> If the offered substitution requires changes or q g s to coordination with other portions of the work,the <br /> Contractor shall include with its substitution request any such drawings and details showing such <br /> changes. The Contractor agrees to perform these changes as part of the substitution of material or <br /> Equipment at no additional cost to the Owner. Approval of a substitution request shall not relieve the <br /> Contractor from responsibility for the efficiency,quality,and performance of the substitute material or <br /> Equipment, in the same manner and degree as the material and Equipment originally specified. Any cost <br /> differential associated with a substitution shall be reflected in the offer. If the Owner approves the <br /> substitution,the Contract Documents shall be modified by a Change Order modifying the Contract Sum <br /> in the amount of the cost differential. <br /> 8.6. DEMONSTRATION OF COMPLIANCE WITH CONTRACT REQUIREMENTS <br /> 8.6.1. Inspection <br /> The burden of proving the constructed Work complies with the Contract Documents shall be on the <br /> Contractor at all times. To demonstrate its compliance with the Contract requirements,the Contractor <br /> shall assist the Owner's Representative in his or her inspection and observation of the Work. The <br /> Contractor shall grant the Owner's Representative access to the Work and Work Site,and to places where <br /> Work is being prepared,or where materials,Equipment,or machinery are being obtained for Work. The <br /> Contractor shall provide information requested by the Owner's Representative in connection with <br /> inspection work. 1 <br /> If the Contract Documents,laws, ordinances,or any public regulatory authority requires parts of the Work <br /> to be specially inspected,tested,or approved,the Contractor shall give the Owner's Representative <br /> adequate prior written Notice of the availability of the subject Work for examination,which Notice shall <br /> be not less than two(2)working days. <br /> Inspection and quality control tests performed on Work by the Contractor by the Owner's Representative <br /> shall not relieve the Contractor of its responsibility for errors or lack of quality therein and shall not be <br /> regarded as an assumption of risks or liability by the Owner's Representative for the Contractor's <br /> compliance with these Contract Documents. Contractor remains responsible and liable for all errors, <br /> defects or a lack of quality not discovered by inspection or observation. I <br /> If parts of the Work are covered prior to inspection or observation,the cost of exposing the Work for <br /> inspection and closing and re-covering shall be borne by the Contractor regardless of whether the Work is <br /> found to be in compliance with the Contract. 111 <br /> 8.6.2. Samples of Materials <br /> The Contractor shall provide Samples or specimens of materials to be incorporated in the Work that <br /> require laboratory examination or special testing,as requested by the Owner's Representative. Such <br /> Samples or specimens shall be provided in ample time to permit making proper test analysis and <br /> examinations before the Contractor plans to incorporate the material into the Work. An independent <br /> testing laboratory will conduct tests of material in accordance with the Specifications. In the absence of a <br /> specific test requirement,the Owner's Representative will determine the appropriate standard test to be <br /> used. <br /> 8.6.3. Certification I <br /> In cases where compliance of materials or Equipment to Contract requirements is not readily <br /> determinable through inspection and tests,the Contractor shall provide properly authenticated documents, <br /> certificates,or other proof satisfactory to the Owner's Representative that the materials and.Equipment <br /> comply with the Contract requirements. These documents,certifications,and proofs shall include <br /> performance characteristics,construction materials,and physical or chemical characteristics of materials. <br /> The Contractor shall pay all associated costs of such certification. I <br /> I <br /> General Conditions—007200-28 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.