My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Neptune General Contractors 1/25/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2022
>
Neptune General Contractors 1/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 10:19:54 AM
Creation date
2/11/2022 10:12:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Neptune General Contractors
Approval Date
1/25/2022
Council Approval Date
12/15/2021
End Date
5/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovation
Public Works WO Number
PW2021-072
Tracking Number
0003186
Total Compensation
$419,650.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> will be made in the a n p yme is due or to become due to the Contractor. Final Acceptance will not act as a <br /> waiver of the Owner's right to recover from the Contractor an amount representing the deduction for <br /> retention of defective and/or noncompliant Work. 111 <br /> 8.8. MATERIALS AND EQUIPMENT FURNISHED BY OWNER <br /> Contractor shall install materials and Equipment furnished by the Owner as provided in the technical <br /> sections of the Specifications. Furnishing of material and Equipment by the Owner will be considered <br /> conclusive evidence of their acceptability for the purpose intended. If the Contractor discovers defects in <br /> material or Equipment furnished by the Owner,he or she shall immediately notify the Owner. After such <br /> discovery,the Contractor shall not proceed with Work involving Owner-furnished materials and <br /> Equipment unless authorized by the Owner. Unless otherwise noted or specifically stated,materials and <br /> Equipment furnished by the Owner,which are not of local occurrence or manufacture,are considered to <br /> be"FOB"railroad station or truck terminal nearest to the Site of the Work. At no cost to the Owner,the <br /> Contractor shall unload,transport, store,and protect such material and Equipment from damage. The <br /> Contractor shall inspect such Owner-furnished material and Equipment on receipt and provide the Owner <br /> with written acceptance for the incorporation of said material and Equipment into the Work. After receipt <br /> by the Contractor,the Contractor bears all risk of loss and casualty to Owner furnished materials and <br /> Equipment. <br /> 8.9. GUARANTEE I <br /> The Contractor warrants to the Owner that all materials and Equipment furnished under this Contract will <br /> be of highest quality and new unless otherwise specified by the Owner,free from faults and defects and in <br /> conformance with the Contract Documents.All Work not so conforming to these standards shall be <br /> considered defective. If required by the Owner's Representative,the Contractor shall furnish satisfactory <br /> evidence as to the kind and quality of materials and Equipment. <br /> The Work furnished must be of first quality and the workmanship must be the best obtainable in the 111 <br /> various trades. The Work must be of safe, substantial and durable construction in all respects. <br /> "Acceptance of the Work"shall not extinguish any covenant or agreement on the part of the Contractor to <br /> be performed or fulfilled under this Contract that has not,in fact,been performed or fulfilled at the time <br /> of such acceptance. All covenants and agreements shall continue to be binding on the Contractor until <br /> they have been fulfilled. <br /> The Owner and the Contractor agree that the guarantee on the completed portions of the Work possessed <br /> and used by the Owner shall commence as to those portions on the date that the Owner takes possession <br /> of those portions and so notifies the Contractor in writing. Owner and Contractor further agree that such <br /> taking possession and use shall not be deemed as acceptance of the Work. Takeover of completed <br /> portions of the Work shall be at the Owner's option and will not be made until the Work can be put into <br /> routine service on a permanent basis. <br /> The guarantee provided in this Section 8.9 shall be in addition to those specific guarantee or warranty <br /> requirements for particular Equipment and Work items as indicated in the Specifications. <br /> 8.10. CORRECTION PERIOD I <br /> If within one year after the date of Substantial Completion,or such longer period of time as may be <br /> prescribed by the terms of any applicable special guarantee or warranty required by the Contract <br /> Documents)or by any specific provision of the Contract Documents,any Work is found to be defective, <br /> or if the repair of any damage to the land or areas made available for Contractor's use by Owner or <br /> permitted by Laws and Regulations as contemplated in Paragraph 8.6.6. is found to be defective, <br /> Contractor shall promptly,without cost to Owner and in accordance with Owner's written instructions: <br /> 1. repair such damaged land or areas; or <br /> 2. correct such defective Work; or <br /> General Conditions—007200-30 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.