My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Neptune General Contractors 1/25/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2022
>
Neptune General Contractors 1/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 10:19:54 AM
Creation date
2/11/2022 10:12:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Neptune General Contractors
Approval Date
1/25/2022
Council Approval Date
12/15/2021
End Date
5/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovation
Public Works WO Number
PW2021-072
Tracking Number
0003186
Total Compensation
$419,650.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
estimate filled out and signed by the Contractor covering acceptable Work performed during the previous <br /> month,or since the last partial payment estimate was submitted. Contractor's submission of a progress <br /> pay estimate constitutes a material representation by the Contractor that it performed all of the Work <br /> described in the progress pay estimate during the relevant time period in a workmanlike manner and that <br /> the materials for which payment is requested reasonably conform to the Specifications and are either on <br /> the job Site or have been installed. If requested by the Owner's Representative,the Contractor shall <br /> 111 <br /> provide such additional data as may be reasonably required to support the payment estimate. Such data <br /> may include satisfactory evidence of payment for Equipment,materials and labor including payments to <br /> Subcontractors and Suppliers. Certified invoices by the Suppliers shall accompany a request for payment <br /> for delivered Equipment and material. Such Equipment and material shall be suitably and safely stored at <br /> the Site of the Work. Payment requests shall summarize accepted operating and maintenance material <br /> with request for Equipment payment. A progress payment is preliminary only. By making a progress <br /> payment,the Owner does not waive or release its right,nor is it estopped from asserting,that previous <br /> progress payments were not earned or were in error,whether in whole or in part. <br /> 9.1.2.2 Review Procedures: <br /> The Owner's Representative will review the estimate and either indicate in writing to the Owner his or <br /> her concurrence with the estimate and his or her recommendation that payment be made, or indicate in <br /> writing to the Contractor his or her reasons for not concurring with the estimate. If the Owner's <br /> Representative recommends payment and the Owner concurs,the Owner will pay the Contractor a <br /> progress payment on the basis of the approved partial payment estimate, less retainage and any amounts <br /> the Owner may withhold pursuant to Contract or law. The recommendation of the Owner's <br /> Representative is not conclusive, final or binding upon the Owner. <br /> In the event the Owner's Representative does not concur with the estimate,the Contractor may make the <br /> changes necessary to obtain the Owner's Representative's concurrence and resubmit the partial payment <br /> estimate,or submit the original progress payment estimate directly to the Owner,indicating in writing its <br /> reasons for refusing to make the changes necessary to obtain concurrence. <br /> 9.1.2.3 Retained Percentage <br /> As provided in 9.7. Retainage,the Owner will retain five percent(5%)of all progress payments. <br /> 9.1.2.4 Withholding <br /> The Owner's Representative may refuse to recommend the whole or any part of any payment if in the <br /> Owner's Representative's opinion it would be incorrect to make such recommendation to the Owner. The <br /> Owner's Representative may also refuse to recommend any such payment,or because of subsequently <br /> discovered evidence or the result of tests,may nullify any such payment previously recommended to such <br /> extent as may be necessary in the Owner's Representative's opinion to protect the Owner from loss as a <br /> result of: <br /> 1. Defective or damaged Work. <br /> 2. A deductive Change Order. <br /> 3. Persistent failure of the Contractor to perform the Work in accordance with the <br /> Contract Documents,including failure to maintain the progress of the Work in <br /> accordance with the construction schedule. Persistent failure to maintain the <br /> progress of the Work shall mean that for a period of two consecutive months <br /> following a written notice from the Owner's Representative or Owner,the <br /> Contractor fails to correct a behind-schedule condition at a rate that would <br /> reasonably indicate that he or she will finish the Project on schedule. <br /> 4. Disregard of authority of the Owner or Owner's Representative or the laws of <br /> any public body having jurisdiction. <br /> 5. Liquidated damages. <br /> I <br /> General Conditions—007200-32 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.