My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Neptune General Contractors 1/25/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2022
>
Neptune General Contractors 1/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 10:19:54 AM
Creation date
2/11/2022 10:12:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Neptune General Contractors
Approval Date
1/25/2022
Council Approval Date
12/15/2021
End Date
5/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovation
Public Works WO Number
PW2021-072
Tracking Number
0003186
Total Compensation
$419,650.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Contractor shall onlybe entitled to an adjustment of Contract Sum for Unabsorbed or Extended <br /> � <br /> Overhead if it clearly and convincingly demonstrates all of the following: <br /> 1. The Owner solely caused a delay to the Completion Date as measured by <br /> analysis of the project duration by the critical path method pursuant to 5.2.2.2 <br /> Extensions of Contract Time; <br /> 2. Because of such Delay,the Contractor was forced to suspend or significantly <br /> interrupt its performance so that it was on standby or idled, and the Owner <br /> required the Contractor to be ready to resume performance on short notice. <br /> Extended time of performance of Work, such as extensions caused by changes, <br /> inefficiencies,or Extra Work,does not constitute suspension or significant <br /> interruption of performance. <br /> ' 3. The Contractor could not and did not use resources,including but not limited to <br /> labor,materials and•equipment, standing by or idled on this or any other project <br /> for any work during the period of delay; <br /> 4. The Contractor's Overhead costs did not materially vary from its usual <br /> seasonal Overhead costs during the period of delay; and <br /> 5. The Delay did not cause Overabsorbed Overhead in the period in which the <br /> delayed Work was completed. <br /> 12.4.3.5.2.1 Resources <br /> To demonstrate the Contractor could not and did not use resources,including but not limited to <br /> labor,materials and equipment from this Project for any other work on this or any other project <br /> during the period of delay(12.4.3.5.2.(3)),the Contractor must: <br /> a. Affirmatively represent and warrant that it did not perform substitute Work; <br /> b. Identify the specific resources that were idled;and <br /> c. Show that those resources did not, and could not,work on other contracts or projects <br /> during the Delay. <br /> 12.4.3.5.2.2 No Material Variations <br /> To demonstrate the Contractor's Overhead costs did not materially vary from its usual seasonal <br /> Overhead costs during the period of delay(12.4.3.5.2.(4)),the Contractor must; <br /> a. Affirmatively represent and warrant that the completion of the subject Work was <br /> extended and that such extension prevented the performance of other work during <br /> both the period of delay and the later period of time required to complete the <br /> extended Work, <br /> b. Disclose the details of Contractor generated billings and Contractor Overhead Costs <br /> (as hereinafter defined)throughout the actual project performance. The details of <br /> such information should be no less than specific identification of the sources and <br /> amounts of revenue on no greater than a monthly basis and specific identification of <br /> the types and amounts of Contractor Overhead Costs on no greater than a monthly <br /> basis for the actual Project duration. <br /> 12.4.3.5.2.3 Overabsorbed Overhead <br /> To demonstrate that it did not incur Overabsorbed Overhead in the period following the Delay <br /> (12.4.3.5.2.(5)),the Contractor must: <br /> a. Affirmatively represent and warrant that completion of the delayed Work prevented <br /> the performance of other work; <br /> I <br /> General Conditions—007200-49 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.