Contractor's Name
Neptune General Contractors
Approval Date
1/25/2022
Council Approval Date
12/15/2021
End Date
5/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovation
Public Works WO Number
PW2021-072
Tracking Number
0003186
Total Compensation
$419,650.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project:Rotary Park Renovation <br /> Change Order No. <br /> Change Order Effective Date: <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax,the amount of the change order for the changes described <br /> in Exhibit A,represents complete compensation for the changes described in Exhibit A,including all direct <br /> and indirect costs and impacts.The contract price shall be adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the Mayor or his designee is <br /> authorized to direct Contractor to perform additional work.In calculating such threshold amounts, <br /> Washington State sales tax,if applicable to the Work,has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change Order. <br /> 5. Contractor waives and releases any and all claims arising out of,or related to,this Change Order,the work <br /> described in Exhibit A,and all work and actual or constructive changes that occurred or began prior to the <br /> date of this Change Order,including,but not limited to,claims for equitable adjustment of time and <br /> compensation,delay,impact,overhead,or inefficiencies. This provision does not apply to requests for <br /> equitable adjustment of time or price for which the Contractor timely and properly provided notice of a <br /> differing site condition,protest,dispute,claim or Contract Claim as required by the Contract Documents. If <br /> the Contract Documents establish a time period for notice of a differing site condition,protest,dispute, <br /> claim,or Contract Claim that ends after the date of this Change Order,but relates to work performed prior <br /> to the date of this Change Order,then this provision does not apply if the Contractor timely and properly <br /> submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the extent explicitly provided <br /> herein. <br /> 1 <br /> I <br /> Rotary Park Renovation Page 4 of 5 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.