Laserfiche WebLink
Section 00 21 13 <br /> INSTRUCTIONS TO BIDDERS <br /> 2. Certification of Compliance with Wage Payment Statutes. To be filled in and signed by the Bidder <br /> The City may also require Bidders other than the apparent low bidder(s)to submit the above item(s). <br /> C. The following forms are to be executed after the award of Contract: <br /> 1. Contract: This Contract to be executed by the successful Bidder in duplicate within 14 calendar <br /> days after the award date. <br /> 2. Payment and Performance Bonds: These forms are to be executed by the successful Bidder and , <br /> surety company in triplicate. The amount of these bonds shall be 100 percent of the Total Bid <br /> Amount and shall be submitted with the Contract. <br /> 3. Proof of Insurance: Insurance certificates and endorsements shall be obtained and maintained <br /> in force in accordance with Section 007200, Part 15 "Liability and Insurance", of the Contract <br /> Documents. I <br /> 4. Power of Attorney: Attorneys-in-fact who sign bid bonds or contract bonds must file with each <br /> bond a certified and effectively dated copy of their Power of Attorney. <br /> 5. Statement of Intent to Pay Prevailing Wage (L&I Form F700-029-000) and Affidavit of Wages <br /> Paid(F700-007-000)from the Contractor,Subcontractor and agents to the Subcontractor shall be <br /> submitted to the Employment Standards Division, State Department of Labor and Industries, <br /> Olympia, Washington. If the prime contract is over $1,000,000, then Contractor also needs to <br /> submit L&I Form F700-164-000(Affidavit of Wages Paid EHB 2805 Addendum), <br /> 6. Weekly Statement with Respect to Payment of Wages (U.S. Dept of Labor Form WH347): , <br /> Contractors, Subcontractors, and agents to Subcontractors using Payroll Form WH347) may use <br /> State of Compliance found on back of form. <br /> 7. Weekly Statement of Compliance (U.S. Dept of Labor Form WH 348). Contractors, 111 <br /> Subcontractors, or agents to Subcontractors not using Payroll Form WH347 shall attach the <br /> Statement of Compliance Form WH 348 to each payroll. <br /> 8. Approval of Subcontractors: Contractors shall request approval of Subcontractors on a form <br /> provided by the City prior to their working on the Site. <br /> 9. Construction Progress Schedule: To be submitted as required by Section 007200,Part 5"Progress <br /> and Completion",of the Contract Documents by the Contractor within ten calendar days, or such <br /> time as determined by the Project Manager or Project Engineer,after the date of receipt of Notice <br /> to Proceed. <br /> 10. Traffic Control Plan: Standard Traffic Control Plans are included in the City's Design and <br /> Construction Standards. If,and to the extent,such plans are not sufficient,complete or adequate <br /> to support the Bidder's planned means and methods of performing the Work, the Bidder must <br /> develop an adequate, complete and sufficient traffic control plan at its cost, that shall be <br /> submitted for the City's approval prior to construction. Deviation from the Standard Plans must <br /> be submitted by the Contractor and approved by the City prior to construction. <br /> 11. Disposal Sites: Provide the Project Manager or Project Engineer with the location of all disposal <br /> sites to be used, and also provide copies of the permits and approvals for such disposal sites. The <br /> Contractor shall provide the Project Manager or Project Engineer with copies of all permits for <br /> disposal and storage of surplus materials within ten calendar days after award of the Contract. <br /> Rotary Park Renovation 10 of 11 1 <br /> I <br />