Laserfiche WebLink
I <br /> Rotary Park Renovation SECTION 00 01 10 <br /> City of Everett Parks& Facilities TABLE OF CONTENTS <br /> 01 1100 Summary of Work <br /> 01 25 00 Substitution Procedures <br /> 01 26 00 Contract Modification Procedures <br /> 01-29-00 Payment Procedures <br /> 01 31 13 Project Coordination <br /> 01 31 19 Project Meetings <br /> 01.32.16 Construction Schedule <br /> 01.33.00 Submittals <br /> 01 35 29 Health and Safety <br /> 0142 00 References I <br /> 0145 00 Quality Control <br /> 01 50 00 Temporary Facilities and Controls <br /> 01 55 00 Vehicular Access and Parking <br /> 01 57 00 Temporary Controls <br /> 01 61 50 Delivery, Storage and Handling <br /> 01 74 23 Final Cleaning <br /> 01 77 00 Closeout Procedures <br /> 01 78 23 Operation and Maintenance Data <br /> 01 78 36 Warranties and Bonds <br /> 01 78 39 Project Record Documents <br /> DIVISION 5: METALS r <br /> 05 50 00 Metal Fabrications <br /> DIVISION 35:WATERWAY AND MARINE CONSTRUCTION I <br /> 35 51 13 HDPE Pipe Float System <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Page 2 of 2 5/18/21 <br /> Job#2021-072 <br /> Table of Contents <br /> I <br />