My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Neptune General Contractors 1/25/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2022
>
Neptune General Contractors 1/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 10:19:54 AM
Creation date
2/11/2022 10:12:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Neptune General Contractors
Approval Date
1/25/2022
Council Approval Date
12/15/2021
End Date
5/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovation
Public Works WO Number
PW2021-072
Tracking Number
0003186
Total Compensation
$419,650.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 43 36 - 1 <br /> ' Rotary Park Renovation PW#2021-072 <br /> ' Rev.2021-01-19 <br /> SECTION 00 4336-PROPOSED SUBCONTRACTORS FORM <br /> PART A <br /> 1. For heating,ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106)and <br /> electrical work (as defined by RCW Chap. 19.28), and structural steel installation and <br /> ' rebar installation, Bidder MUST either identify itself or Subcontractors in the chart below. <br /> If Bidder believes such work is not part of the scope of Work, Bidder shall write "NO <br /> WORK". <br /> ' 2. Bidder shall not list more than one Subcontractor for each category of work identified, <br /> unless Subcontractors vary with bid alternates, in which case the Bidder must indicate <br /> which Subcontractor will be used for which alternate. <br /> 3. Bidder's bid shall be deemed nonresponsive and void if: <br /> A. For heating, ventilation, air conditioning, plumbing, electrical, structural steel <br /> installation and rebar installation, Bidder fails (1) to submit as part of the Bid the <br /> names of'such Subcontractors, (2) to name itself to perform such Work, or (3) to <br /> write "No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, <br /> plumbing, electrical, structural steel installation and rebar installation subcontractors <br /> applies only to proposed heating, ventilation and air conditioning, plumbing, electrical, <br /> structural steel installation and rebar installation subcontractors who will contract directly <br /> ' with the general contractor submitting the Bid to the City. <br /> 5. The heating, ventilation and air conditioning, plumbing, and electrical portions of the chart <br /> below must be submitted with the bid proposal or within one hour of the published bid <br /> submittal time. <br /> 6. The structural steel installation and rebar installation portions of the chart below must be <br /> submitted with the bid proposal or within forty-eight hours of the published bid submittal <br /> time. <br /> Type/Scope of Work Name and Address of Subcontractor/or <br /> ' Bidder <br /> HEATING <br /> Subcontractor, bidder or"no work" MUST be stated <br /> ' VENTILATION AND AIR CONDITIONING <br /> Subcontractor, bidder or "no work" MUST be stated <br /> PLUMBING (as described in RCW Chap. 18.106) <br /> ' Subcontractor, bidder or"no work" MUST be stated <br /> ELECTRICAL (as described in RCW Chap. 19.28) <br /> Subcontractor, bidder or "no work" MUST be stated <br /> ' STRUCTURAL STEEL INSTALLATION <br /> Subcontractor, bidder or "no work" MUST be stated <br /> REBAR INSTALLATION <br /> Subcontractor, bidder or"no work" MUST be stated <br /> 00 43 36 - 1 PROPOSED SUBCONTRACTORS FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.