Laserfiche WebLink
r <br /> Section 00 63 25 <br /> Substitution Request Form <br /> E. Manufacturer's guarantees of proposed and specified items are: <br /> Same Different(Explain on attachment) I <br /> F. Name and address of three(3) similar projects on which product was used, and date of <br /> installation <br /> I <br /> G. Contract completion date is: Same Different(Explain on attachment). I <br /> H. Cost Savings? <br /> Undersigned attests function and quality equivalent or superior to specified item and waives his I <br /> rights to additional payment and time which may subsequently be necessitated, by failure of the <br /> substitution to perform adequately,and for the required work to make corrections thereof. <br /> Signature must be by a person having authority to legally bind his firm to the above terms. <br /> Failure to provide legally-binding signature will result in approval retraction. <br /> Submitted by: , <br /> Signature Date I <br /> Printed <br /> Firm I <br /> Address <br /> Telephone <br /> For use by Architect: <br /> Accepted Accepted as Noted Not Accepted Received Too Late <br /> BY: Date: <br /> Remarks: <br /> Rotary Park Renovation 2 of 3 <br /> I <br />