1 <br /> Project: Rotary Park Renovation <br /> Change Order No. <br /> Change Order Effective Date: <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work.In <br /> calculating such threshold amounts,Washington State sales tax,if applicable to the <br /> Work, has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to,this I <br /> Change Order,the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to,claims for equitable adjustment of time and compensation,delay,impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition,protest,dispute,claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute,claim, or Contract Claim that ends <br /> after the date of this Change Order,but relates to work performed prior to the date of <br /> this Change Order,then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> 7. Signature(s) on this Change Order may be by pdf, email, fax or other electronic means, <br /> in which case such signature(s) will have the same effect as an original signature. <br /> [signatures on following page] <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Page 2 of 3 <br /> 1 <br />