My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Neptune General Contractors 1/25/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2022
>
Neptune General Contractors 1/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 10:19:54 AM
Creation date
2/11/2022 10:12:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Neptune General Contractors
Approval Date
1/25/2022
Council Approval Date
12/15/2021
End Date
5/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovation
Public Works WO Number
PW2021-072
Tracking Number
0003186
Total Compensation
$419,650.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Section 007200 I <br /> General Conditions <br /> I 8.2. Product Data 27 <br /> 8.3. Quality 27 <br /> 8.4. Material and Equipment Specified by Name 27 <br /> I 8.5. Requests for Substitution 27 <br /> 8.6. Demonstration of Compliance with Contract Requirements 28 <br /> 8.6.1. Inspection 28 <br /> I 8.6.2. Samples of Materials 28 <br /> 8.6.3. Certification 28 <br /> 8.6.4. Inspection at Point of Manufacturing 29 <br /> I 8.6.5. Testing and Commissioning of Completed Work 29 <br /> 8.6.6. Storage of Materials and Equipment 29 <br /> 8.6.7. Manufacturer's Directions 29 <br /> I 8.7. Defective Work 29 <br /> 8.7.1. Correction of Defective Work 29 <br /> 8.7.2. Retention of Defective Work 29 <br /> 111 8.8. Materials and Equipment Furnished by Owner 30 <br /> 8.9. Guarantee 30 <br /> 8.10. Correction Period 30 <br /> I9. MEASUREMENT AND PAYMENT 31 <br /> 9.1. Payments to Contractor 31 <br /> I 9.1.1. Schedule of Values 31 <br /> 9.1.2. Progress Payments 31 <br /> 9.1.2.1 Payment Request Procedures. 31 <br /> I 9.1.2.2 Review Procedures: 32 <br /> 9.1.2.3 Retained Percentage 32 <br /> 9.1.2.4 Withholding 32 <br /> I 9.1.3. Final Payment 33 <br /> 9.2. Payment for Changes 34 <br /> 9.2.1. Changes in Estimated Quantities of Unit Price Work 34 <br /> I9.2.1.1. Increased Quantities 34 <br /> 9.2.1.2. Decreased Quantities 34 <br /> 9.2.1.3. Limitations 34 <br /> I9.2.2. Changes in Work Not Covered By Unit Prices 35 <br /> 9.2.3. Deleted Work 35 <br /> I 9.3. Charges to Contractor 36 <br /> 9.4. Compensation to Owner for Time Extension 36 <br /> 9.5. Adjustment of Contract Sum 36 <br /> I 9.5.1 Calculation 36 <br /> 9.5.2 Limitations 36 <br /> 9.5.3 Unabsorbed and Extended Overhead 37 <br /> I 9.6. Force Account 38 <br /> 9.6.1 Labor 38 <br /> 9.6.2. Materials. 39 <br /> 9.6.3. Equipment 39 <br /> - General Conditions—007200-iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.