Neptune General Contractors 1/25/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2022
>
Neptune General Contractors 1/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 10:19:54 AM
Creation date
2/11/2022 10:12:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Neptune General Contractors
Approval Date
1/25/2022
Council Approval Date
12/15/2021
End Date
5/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovation
Public Works WO Number
PW2021-072
Tracking Number
0003186
Total Compensation
$419,650.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 2.3.3.2 Known Utilities <br /> The Contractor shall provide at its sole expense all labor, equipment,materials and services necessary to <br /> remove,relocate,or maintain utilities specified on the Drawings. The work on each utility shall be <br /> performed in a manner satisfactory to the utility owner. The utility owner has the option of doing such <br /> work with its own forces at the Contractor's expense,or permitting the work to be performed by the <br /> Contractor. I <br /> 2.3.3.3 Service Connections <br /> Locations of service connections are not identified on the Drawings. The Contractor shall provide at its <br /> sole expense all labor,equipment and material to remove,relocate or maintain service connections. Work <br /> on service connections shall be performed in a manner satisfactory to the service connection owner. The <br /> service connection owner has the option of doing such work with its own force at the Contractor's <br /> expense,or permitting the work to be performed by the Contractor. <br /> 2.3.3.4 Unknown Utilities <br /> When a utility interferes with the Work and is either(1)not identified on the Drawings or(2)located in a <br /> position significantly different from that specified on the Drawings, Contractor shall follow the <br /> procedures of 11.DIFFERING SITE CONDITIONS. Interference with the Work is defined as a utility <br /> that crosses or projects into the plane of the Work at an elevation between the top and bottom of the <br /> Work. If it is necessary to remove,relocate,or temporarily maintain the utility,that work shall be <br /> included in a Change Order. The utility owner has the option of doing such work or permitting the work <br /> to be performed by the Contractor. In either case,the cost of the work incurred by or charged to the <br /> Contractor will be included in a Change Order. <br /> 2.4. SUBMITTALS <br /> Where required by the Contract Documents,the Contractor shall submit information which will enable <br /> the Owner's Representative to advise the Owner whether the Contractor's proposed materials,Equipment <br /> or methods of work are in general conformance to the design concept and in compliance with the <br /> Drawings and Specifications, such as catalog cuts and shop, working or detail drawings. In its <br /> Submittals,the Contractor shall expressly and explicitly notify the Owner's Representative of any and all <br /> deviations from the Specifications. Without express and explicit Notice of a deviation from the Contract <br /> requirements, approval of a Submittal does not relieve Contractor from complying with Contract <br /> requirements. The Owner's approval of a Submittal does not constitute a waiver of the Contract <br /> requirements. The Owner or Owner's Representative shall respond to a Submittal within thirty(30)days <br /> of receipt. The Owner or Owner's Representative may extend this time for good cause by notifying the <br /> Contractor. The Owner will not be obligated to accept or pay for Work performed by the Contractor that <br /> may be affected by materials,Equipment,or methods of work not submitted in a timely manner so that <br /> final review can be accomplished before the affected Work is complete. The Owner shall not be <br /> responsible for Delays,inefficiencies, or any additional costs or expenses caused in whole or in part by <br /> Contractor's failure to submit required information in sufficient time for review,comment, and <br /> correction. Contractor's failure to submit required information in sufficient time for review,comment <br /> and correction shall be deemed a waiver of any and all Contract Claims for adjustment of Contract Sum <br /> or Contract Time arising out of,or related to,such a Submittal. Contractor acknowledges and agrees that <br /> it may not rely upon receiving the Owner's response to a Submittal in less than thirty(30)days,unless the <br /> Owner explicitly changes this section by a signed Change Order. Requests for information or <br /> clarification from the Contractor to the Owner shall be treated as a Submittal. <br /> 2.5. CONTRACTOR'S COPIES OF CONTRACT DOCUMENTS <br /> The Contractor shall keep at the construction site at least one set of Contract Documents and one set of <br /> full-size Drawings that shall be available to the Owner's Representative and Owner. <br /> t <br /> General Conditions—007200-8 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.