My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company 2/2/2022
>
Contracts
>
Capital Contract
>
Reece Construction Company 2/2/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 11:44:36 AM
Creation date
2/11/2022 1:20:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company
Approval Date
2/2/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Jennifer Bailey
Subject / Project Title
2022 Tulalip Water Pipeline Mortar Repair
Public Works WO Number
UT3774
Tracking Number
0003187
Total Compensation
$1,054,519.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Company 5/13/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Change Order No. <br /> Change Order Effective Date: <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax, the amount of the change order 1 for the changes described in Exhibit A, represents complete compensation for the <br /> changes described in Exhibit A, including all direct and indirect costs and impacts. <br /> The contract price shall be adjusted as described in this Change Order. I <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. <br /> In calculating such threshold amounts, Washington State sales tax, if applicable to <br /> the Work, has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change 1 <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order, the work described in Exhibit A, and all work and actual or 111 <br /> constructive changes that occurred or began prior to the date of this Change Order, <br /> including, but not limited to, claims for equitable adjustment of time and <br /> compensation, delay, impact, overhead, or inefficiencies. This provision does not <br /> apply to requests for equitable adjustment of time or price for which the Contractor <br /> timely and properly provided notice of a differing site condition, protest, dispute, <br /> claim or Contract Claim as required by the Contract Documents. If the Contract <br /> Documents establish a time period for notice of a differing site condition, protest, <br /> dispute, claim, or Contract Claim that ends after the date of this Change Order, but <br /> relates to work performed prior to the date of this Change Order, then this provision <br /> does not apply if the Contractor timely and properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> 7. Signature(s) on this Change Order may be by pdf, email, fax or other electronic <br /> means, in which case such signature(s) will have the same effect as an original ink <br /> signature. This Change Order may be signed in counterparts, each of which shall be <br /> deemed an original, and all of which, taken together, shall be deemed one and the <br /> same document. <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.