My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company 2/2/2022
>
Contracts
>
Capital Contract
>
Reece Construction Company 2/2/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 11:44:36 AM
Creation date
2/11/2022 1:20:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company
Approval Date
2/2/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Jennifer Bailey
Subject / Project Title
2022 Tulalip Water Pipeline Mortar Repair
Public Works WO Number
UT3774
Tracking Number
0003187
Total Compensation
$1,054,519.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Company 5/13/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 25 <br /> 2022 Tulalip Pipeline Mortar Repair UT 3774 <br /> procedures required by the Department of Labor and Industries. Upon the completion of the Work,the <br /> Contractor and all of its Subcontractors shall submit affidavits of wages paid to the Department of Labor <br /> and Industries in such form as may be required by said Department. Payment of the retained percentage <br /> will not be made until certification is received from the Department of Labor and Industries that the <br /> prevailing wage requirements of state law have been satisfied. <br /> B. Any fees charged by the Department of Labor and Industries for filing such statements or <br /> submitting such affidavits shall be the responsibility of the Contractor, and each Subcontractor; if, for any <br /> reason,the Owner pays such fees,then the Contractor shall be charged the amounts thereof. <br /> 111 C. Unless otherwise determined by Owner,the Owner will require payroll reports for the Contractor <br /> and every Subcontractor be submitted weekly to the Construction Division,Public Works Annex, 3101 <br /> Cedar Street,Everett, Washington 98201. The payroll reports shall contain the following information: <br /> 1. Name and residence address of each worker. <br /> 2. Social Security number of each worker. <br /> 3. Classification of work performed by each worker. The classification shall be specific and <br /> match the classification categories listed in the Contract Documents. <br /> 4. Total number of hours employed each day. <br /> 5. Total number of hours employed during the payroll period. <br /> 6. Straight time and overtime hourly rate of wages paid to each worker. <br /> 7. Total or gross amount earned by each worker. <br /> 8. Deductions for Medical Aid,FICA,Federal withholding tax, and any other deductions <br /> taken. <br /> 9. Net amount paid each worker. <br /> 10. Contractor's, or Subcontractor's,name and address. <br /> 11. Days and dates worked. <br /> 12. Date of final day of pay period. <br /> 13. Whether fringe benefits were paid to each worker as part of the hourly wage rate or <br /> whether fringe benefits were paid into an approved plan, fund, or program. <br /> Payrolls may be submitted on Federal payroll form WH-347, or equivalent. The reverse side of the form <br /> contains an affidavit that shall be filled out and signed. If the Contractor's payroll reports are <br /> computerized,the computerized reports may be submitted along with a Statement of Compliance affidavit <br /> photo copied from the back of form WH-347, or equivalent. <br /> The first payroll submitted for the Work for both the Contractor and each Subcontractor shall be labeled <br /> "Initial." The last payroll submitted for the Work for both the Contractor and each Subcontractor shall be <br /> labeled"Final." Payrolls shall be sequentially numbered for all periods in which Work has been done. A <br /> certificate of completion for the Work, signed by the City,will constitute acceptance of the Work. The <br /> issuance of this certificate of completion will not constitute acceptance of unauthorized or defective Work <br /> or material is performed. <br /> 7.3. HOURS OF LABOR <br /> Contractor shall comply with all applicable laws and regulations regarding hours of work, including,but <br /> not limited to,RCW Chap. 49.28. <br /> 7.4. CONTRACT WORK HOURS <br /> The Contractor shall comply with Section 103 of the Contract Work Hours and Safety Standards Act(40 <br /> U.S.C. section 327-330) as supplemented by Department of Labor Regulations(29 CFR,Part 5). Under <br /> 00 7200 - 25 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.