My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company 2/2/2022
>
Contracts
>
Capital Contract
>
Reece Construction Company 2/2/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 11:44:36 AM
Creation date
2/11/2022 1:20:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company
Approval Date
2/2/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Jennifer Bailey
Subject / Project Title
2022 Tulalip Water Pipeline Mortar Repair
Public Works WO Number
UT3774
Tracking Number
0003187
Total Compensation
$1,054,519.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Company 5/13/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 56 <br /> 2022 Tulalip Pipeline Mortar Repair UT 3774 <br /> If an audit is to be commenced more than sixty(60) days after the Final Acceptance date of the Contract, <br /> the Contractor will be given twenty(20) days' notice of the time when the audit is to begin. If any <br /> litigation, claim, or audit arising out of, in connection with, or related to this Contract is initiated,the <br /> Project records shall be retained until the later of(a) completion of litigation, claim, or audit or(b) six <br /> years after the date of Final Acceptance. <br /> 17.2 CLAIMS ' <br /> All Contract Claims filed against the Owner shall be subject to audit at any time following the filing of <br /> the Contract Claim. Failure of the Contractor, Subcontractors, or lower tier Subcontractors to maintain <br /> and retain sufficient records to allow the auditors to verify all or a portion of the Contract Claim or to <br /> permit the auditor access to the books and records of the Contractor, Subcontractors, or lower tier <br /> Subcontractors shall constitute a waiver of a Contract Claim and shall bar any recovery thereunder. <br /> 17.3 REQUIRED DOCUMENTATION FOR AUDITS <br /> As a minimum,the auditors shall have available to them the following documents: <br /> Daily time sheets and supervisor's daily reports. <br /> Collective Bargaining Agreements. <br /> Insurance,welfare, and benefit records. I <br /> Payroll registers. <br /> Earnings records. i <br /> Payroll tax forms. <br /> Material invoices and requisitions. <br /> Material cost distribution worksheet. <br /> Equipment records (list of company equipment, rates, etc.) <br /> Vendors',rental agencies', Subcontractors' and lower tier Subcontractors' invoices. , <br /> Contracts between the Contractor and each of its Subcontractors,and all lower tier Subcontractor <br /> contracts and Supplier contracts. <br /> Subcontractors' and lower tier Subcontractors' payment certificates. <br /> Canceled checks (payroll and vendors). <br /> Job cost reports, including monthly totals. <br /> Job payroll ledger. <br /> General ledger. , <br /> Cash disbursements journal. <br /> Financial statements for all years reflecting the operations on this Contract. In addition,the <br /> Owner may require, if it deems appropriate, additional financial statements for 3 years preceding <br /> execution of the Contract and 3 years following Final Acceptance of the Contract. <br /> Depreciation records on all company equipment whether these records are maintained by the <br /> company involved, its accountant, or others. <br /> If a source other than depreciation records is used to develop costs for the Contractor's internal <br /> purposes in establishing the actual cost of owning and operating equipment, all such other source I <br /> documents which support the amount of damages as to each Contract Claim. <br /> Worksheets or software used to prepare the Contract Claim establishing the cost components for <br /> items of the Contract Claim including but not limited to labor,benefits and insurance,materials, <br /> 00 7200 - 56 GENERAL CONDITIONS S <br />
The URL can be used to link to this page
Your browser does not support the video tag.