Laserfiche WebLink
City of Everett 00 4113 - 2 <br /> 2022 Tulalip Water Pipeline Mortar Repair UT 3774 <br /> ITEM ESTIMATED UNIT CONTRACT <br /> NO. DESCRIPTION UNIT QUANTITY PRICE PRICE I <br /> 1. Mobilization and LS 1 N/A <br /> IlDemobilization $ <br /> 2. Traffic Control LS 1 N/A $ <br /> 3 Dewater Segments for LS 1 N/A I <br /> Mortar Repair $ <br /> 4 Remove and Replace EA 157 1 <br /> Field Applied Mortar $ <br /> 5 Fill, Disinfect, and LS 1 N/A $ I <br /> Flush Pipeline . <br /> Spot Inspection of I <br /> 6 Lateral and LS 1 N/A <br /> Circumferential $ <br /> Cracking I <br /> 7. Crack Repair LF 500 $ . <br /> 8 Force Account N/A N/A I <br /> (Section 00 7200) — $15,000.00 <br /> SUBTOTAL $ . I <br /> Washington State Sales $ <br /> Tax@9.8% I <br /> TOTAL BID $ . <br /> I <br /> 1.3 ACCEPTANCE <br /> A. This offer shall be open to acceptance and is irrevocable for 45 days from the Bid I <br /> closing date. <br /> B. If this Bid is accepted by the Owner within the time period stated above, we will: <br /> 1. Execute the Agreement within 14 days of receipt of Notice of Award. <br /> 2. Furnish the required 100% payment and 100% performance bonds within I <br /> 14 calendar days of receipt of Notice of Award in the form described in <br /> Contract Documents. <br /> 3. Commence Work within seven calendar days after receipt of Notice to <br /> 111 <br /> Proceed. <br /> 1 <br /> 004113 - 2 BID FORM <br /> I <br />