Laserfiche WebLink
I <br /> I City of Everett 004513 - 3 <br /> 2022 Tulalip Water Pipeline Mortar Repair UT 3774 <br /> IChristina Parker Transportation Manager 36o-716-4000 christinaparker@atulaliptribes-nsn.gov <br /> I <br /> 3. Supplementary The Su lementa Instructions to Bidders (Section 00 2213) states that the <br /> I Bidder's superintendent for the Project must have successfully supervised the <br /> completion of at least 3 Similar Projects within the 10 years prior to bid opening. <br /> List the superintendent's name and projects that show that he or she has this <br /> experience: <br /> IName: Mark Stanavich <br /> IPROJECT NAME YEAR OWNER LOCATION <br /> Tulalip Water Pipeline <br /> Project Seg 5 Lining Repair 2021 Tulalip Tribes Tulalip,WA <br /> I Tulalip Water Pipeline- <br /> Big Water Break 2oi8 Tulalip Tribes Tulalip,WA <br /> Tulalip Water Pipeline <br /> I <br /> Project Segment 2 2018 Tulalip Tribes Tulalip,WA <br /> I <br /> IFurnish references for information concerning all work listed above: <br /> NAME TITLE PHONE NUMBER EMAIL ADDRESS <br /> IChristina Parker Transportation Manager 360-716-4000 christinaparker@atulaliptribes-nsn.gov <br /> Debra Bray Transportation Manager 360-754-2294 dbray@tulaliptribes-nsn.gov <br /> IChristina Parker Transportation Manager 360-716-4000 christinaparker@atulaliptribes-nsn.gov <br /> I <br /> I <br /> I00 4513 - 3 BIDDER QUALIFICATION STATEMENT <br /> I <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />