Laserfiche WebLink
City of Everett 00 5213 - 1 <br /> 2022 Tulalip Water Pipeline Mortar Repair UP 3774 <br /> SECTION 00 5213 - AGREEMENT FORM <br /> CONTRACT <br /> THIS CONTRACT is made and entered into this '6da of y ��(.�M��R ,��®�1, by <br /> and between the City of Everett, Washington, a municipal corporation existing under the <br /> laws of the State of Washington (the "City") and <br /> (Z E.E.Cr. ( l STkvC't too , (the "Contractor"). <br /> In consideration of the sums to bepaid to it bythe City, Contractor herebycovenants and <br /> Y, <br /> agrees to furnish all labor, tools, materials, equipment, and supplies required to build and <br /> construct and to build and construct in a workmanlike manner the work, improvements, <br /> and appurtenances in accordance with the Specifications and Drawings and all other <br /> Contract Documents entitled: "aO AAL V ", (the "Project"). <br /> ' mv(-r�,(� Re.4Aiik <br /> 1. Contract Documents. The "Contract Documents' are cefined in the General <br /> Conditions. The Contract Documents are part of this Contract and are hereby <br /> ' incorporated by reference. Terms that are capitalized in a Contract Document but not <br /> defined in that Contract Document shall have the meaning defined to them in the other <br /> Contract Documents. <br /> 2. Contract Time. Substantial Completion of the Work shall be achieved before <br /> April 29, 2021. Physical Completion shall be within Fifteen (15) calendar days after the <br /> ' actual date of issuance of Substantial Completion. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put <br /> to additional expense in the event that the Contractor does not complete the Work in all <br /> ' respects and have it ready for use by the Substantial and Physical Completion dates <br /> stated above. Because it is difficult to accurately compute the amount of such costs <br /> and damages, the Contractor hereby covenants and agrees to pay to the City liquidated <br /> damages for each and every calendar day (or working day, if Contract Time is <br /> described in working days) in the amounts set forth in this Section. For failure to <br /> ' achieve Substantial Completion by the Substantial Completion date stated above, the <br /> Contractor shall pay liquidated damages to the City computed at the daily rate of fifteen <br /> percent (15%) of the Contract Sum divided by the number of days of Contract Time <br /> stated above. Once Substantial Completion is achieved, for failure to achieve Physical <br /> Completion by the Physical Completion Date stated above, the Contractor shall pay <br /> liquidated damages at the daily rate of ten percent (10%) of the liquidated damages rate <br /> 111 applicable to delays to Substantial Completion. <br /> 4. Contrac Sum. The amount of this Contract is <br /> 41 D 51A 5 11.o. o ($ and is based <br /> on the proposal/bid submitted by Contractor dated (01 -O -).O .t and is inclusive of <br /> Washington state sales tax. The basis for final payment will be the actual amount of <br /> 1 <br /> 00 5213 - 1 AGREEMENT FORM <br />