Laserfiche WebLink
September 7� 1565 , <br /> . � <br /> / �,<i <br /> 11 �� <br /> � QA <br /> / <br /> Yr 5i fJwrland <br /> NaMland Conetruction Co� Inc. <br /> P 0 Boz 958 <br /> Everett� i9ashinQton RE: Temporary Porer <br /> lat National Bank B1dQ <br /> Deer Sirs <br /> Received your letter of September 3rd and the followinQ correctione <br /> �u�t be made= <br /> The brsnch circuits ae used do not meet the requirements of Section <br /> 240-5 of the N�tional Electric Code. The branch circuit protection <br /> violates Section 2A0-20 of the N.E.C. <br /> Load rendinas teken are in excees of the allowable carryinQ capacity <br /> of the wire given in T�ble 31�)-12 N.E.C. No consideration raa Qiven <br /> to keepinQ the loads within the a!lowabie range required by Section <br /> 220-2 0£ the N.E.C. <br /> The branch circuit wire doe• not comply with Section 3D0-4 cf the N.E.C. <br /> The groundinQ does not comply with Section 250-A5 of the N.E.C. <br /> The brench circuits nnd fusinQ cannot meet the requirement� of Section <br /> 110-2 of the N.E.C. <br /> A eheetmetal worker hne received e �evere shock due to the poor co�dition <br /> of the insulation on th� eonr.'uetor�. <br /> The P.U.D. Me been notified� letter herewitli atteched� to disconnect <br /> the power 4o thie job Septs�ber 10� 1%5� unleee otherrrise notified <br /> by thia office. <br /> Yours truly <br /> L, J. DouQherty <br /> Electrical I��pector <br /> LJDsRM <br />