Laserfiche WebLink
S • <br /> Drew Martin <br /> From: Drew Martin <br /> Sent: Thursday,August 19, 2021 12:57 PM <br /> To: Chris Bacus;Jeff Bozick <br /> Subject: City of Everett Permit Services: 600 Alverson Blvd <br /> Good afternoon,gentlemen. <br /> This email recaps our conversation regarding proposed redlines to the submitted drawings. Note that one or two of the <br /> items below may be in addition to our discussion. <br /> 1. Revise concrete anchors to adhesive with 2" minimum edge distance and 3" plate washers. Add note that <br /> blocking may be notched for clearance at anchors. <br /> 2. Provide toenails between blocking and joists in Detail 1. <br /> 3. Add blocking between rim joist and first interior joist at 4'spacing in Detail 2. <br /> 4. Add note recommending use of screws if allowed by manufacturer to fasten uppermost LPT4s to wall bottom sill <br /> plate to improve connection through wall sheathing. <br /> 5. Amend General Note 19 to fill cavities to extent possible. <br /> 6. Add General Note 20 requiring structural observation. <br /> 7. Add notes for water-barrier and construction details at brick veneer. <br /> Please let me know if you have questions. <br /> Drew Martin, P.E.,S.E. <br /> I. Associate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Phone Hours: M/W/T: 8 am - 12 pm & 1 pm—3 pm;Tu: 1:00pm-3:OOpm <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 1 <br />