My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2409 FULTON ST 2022-02-14
>
Address Records
>
FULTON ST
>
2409
>
2409 FULTON ST 2022-02-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 2:41:13 PM
Creation date
2/14/2022 2:41:05 PM
Metadata
Fields
Template:
Address Document
Street Name
FULTON ST
Street Number
2409
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/16/2021 Page <br /> City of Everett <br /> 7:00:39AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2106-152 Site Address 2409 FULTON ST <br /> Applied 6/17/2021 Applicant Matthew Kelly Lot <br /> Approved 6/18/2021 Owner REDICK-SPARKS LOGAN Block <br /> Issued 6/21/2021 Contractor SOLGEN POWER(ELEC)LLC Tract <br /> Parent Permit No. B2106-040 Description CIRCUIT:PV SOLAR ROOF MOUNT(2)CIRCUIT <br /> Notes **MANUFACTURER SPEC TO BE ONSITE FOR BLDG INSPECTOR TO REFER TO** <br /> Scheduled Completed Tune Inspector Result Remarks Inspector's Comments <br /> 8/6/2021 8/6/2021 ELEC 09-FINAL SKB CORRECTION eTRAKiT Inspection 8/5/2021 3:46 PM SOLGEN POWER <br /> Request (ELEC)LLC <br /> Contact Name:SOLGEN POWER <br /> (ELEC)LLC <br /> Site Address:2409 FULTON ST <br /> Phone:5099311663 <br /> e-Mail: <br /> PERMITTING.WA@SOLGENPOWER.CO <br /> M <br /> (8/6/2021 4:15 PM SKB) <br /> Bond the metallic conduits on both ends <br /> with a grounding electrode conductor.Seal <br /> the conduit from the outside entering the <br /> electrical service panel. <br /> 10/8/2021 10/8/2021 ELEC 09-FINAL SKB CORRECTION eTRAKiT Inspection 10/6/2021 1:32 PM SOLGEN POWER <br /> Request (ELEC)LLC <br /> Contact Name:SOLGEN POWER <br /> (ELEC)LLC <br /> Site Address:2409 FULTON ST <br /> Phone:7655921414 <br /> e-Mail: <br /> PERMITTING.WA@SOLGENPOWER.CO <br /> M <br /> (10/8/2021 2:45 PM SKB) <br /> Still need to bond the conduit coming from <br /> the roof. <br /> 11/15/2021 11/15/2021 ELEC 09-FINAL SKB APPRVD-PERN eTRAKiT Inspection 11/11/2021 11:19 AM Christina Pauu <br /> Request CALL DANIEL LAPP 1 HOUR BEFORE <br /> ARRIVAL 509-987-8010 <br /> Contact Name:Christina Pauu <br /> Site Address:2409 FULTON ST <br /> Phone:5099311663 <br /> e-Mail:Christina.pauu@solgenpower.com <br /> INSP12 <br /> a*1`, Tct5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.