Laserfiche WebLink
I <br /> Waterford Apartments Roof Replacement <br /> Scope of work: Roof replacement for building K <br /> 1. Remove 2 layers of roofing materials down to existing sheathing. <br /> 2. Install one-layer ice and water shield membrane against chimneys, and exposed <br /> penetrations. Install one layer of synthetic roofing underlayment over entire roof deck. <br /> 3. Install new"No-Caulk"galvanized pipe flashings. <br /> 4. Install new 2" 26-gauge, baked enamel metal at all vertical rakes. Install new 1"x 3" 26-gauge <br /> baked enamel starter metal at gutter edges. <br /> 5. Install new AF50 roof vents. <br /> 6. Install new composition roof shingles and standard ridge cap shingles. <br /> 7. Haul away and dispose of all roofing debris at an offsite facility. <br /> I¢i <br /> 1 <br />