Laserfiche WebLink
S <br /> September 20, 2021 C, " rq` � E <br /> 1RDrew Martin et�t} 2 It 2021 <br /> Associate Engineer/ cm( OF EVERETT <br /> Commercial Plans Examiner Permit Services <br /> City of Everett <br /> RE: B2017-044 <br /> CORRECTION RESPONSE <br /> Dear Mr. Martin, <br /> Here are the corrections that were made to the revised Architectural plans in reference <br /> to your letter dated August 27, 2021: <br /> General: <br /> -- Items 1-3 =See revised plan on sheet A-1 <br /> Architectural: <br /> --Items 1-2 =See proposed floor plan on sheet A-2. <br /> Structural: <br /> --Item 1=See existing main & demo floor plan on sheet A-1 <br /> --Item 2=See proposed floor plan on sheet A-2 <br /> Thank you for your Attention. <br /> Sincerely, <br /> Carmelo N. Laviste <br /> CNL Design <br /> C. 206-6832395 <br /> E. cnldesign.drafting@gmail.com <br />