Laserfiche WebLink
12/20/2021 Page 2 <br /> City of Everett L <br /> 10:13:10AM <br /> INSPECTION ACTIVITY REPORT <br /> 3/8/2021 3/8/2021 BLDG KMK APPROVAL eTRAKiT Inspection 3/5/2021 7:36 AM Mazen Wallaia <br /> 12-INSULATION Request <br /> Contact Name:Mazen Wallaia <br /> Site Address:510 MADISON ST <br /> Phone:2064193709 <br /> e-Mail:Mazen.aborami@gmail.com <br /> 3/8/2021 3/8/2021 BLDG KMK APPROVAL <br /> 10-DRYWALL <br /> 7/9/2021 7/9/2021 PERMIT KLC EXTENSIONA COVID <br /> EXTENSION EXTENSION <br /> 9/22/2021 9/22/2021 BLDG 16-FINAL KMK CORRECTION see notes 9/21/2021 10:02 AM Mazen Wallaia <br /> Contact Name:Mazen Wallaia <br /> Site Address:510 MADISON ST <br /> Phone:2064193709 <br /> e-Mail:Mazen.aborami@gmail.com <br /> (9/22/20214:28 PM KMK) <br /> 1.Complete ADA hardware in bathroom <br /> 2.Exterior ramps:handrails must be <br /> continuous <br /> 3.Front stairs must be to code.Maximum <br /> 3/8"variation in rise and run. <br /> Recall for final when ready.Have plans and <br /> inspection checklist on site for next <br /> inspection. <br /> 12/7/2021 12/7/2021 BLDG 16-FINAL KMK CORRECTION front steps 11/30/2021 2:46 PM Mazen Wallaia <br /> If possible we would like to have a morning <br /> inspection. Thank you <br /> Contact Name:Mazen Wallaia <br /> Site Address:510 MADISON ST <br /> Phone:2064193709 <br /> e-Mail:Mazen.aborami@gmail.com <br /> (12/7/2021 3:31 PM KMK) <br /> Front entry steps must be to code as <br /> discussed. <br /> 12/14/2021 12/14/2021 BLDG 16-FINAL KMK APPRVD-PERN eTRAKiT Inspection 12/13/2021 12:04 PM Mazen Wallaia <br /> Request the front steps <br /> Contact Name:Mazen Wallaia <br /> Site Address:510 MADISON ST <br /> Phone:2064193709 <br /> e-Mail:Mazen.aborami@gmail.com <br /> INSP12 C _ S YsTE M S <br />