Laserfiche WebLink
PUBLI WORKS PERMIT 110 Date Applied: 2/25/2019 <br /> City Everett Permit Services <br /> Public Works Permit#: PW1902-028 <br /> EVERETT 3200 Cedar Street, 2 0 Floor Associated Bldg Permit#: C1902-012 <br /> Everett, WA 9821 Planning Reference#: REVII19-011 <br /> WASHINGTON 425-257-8810 Public Works Fee: $989.70 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADD S5 ti i y FINAL <br /> GRANDVIEW AVE LLC GRANDVIEW AVE LLC APPROVAL <br /> 3615 188TH ST NW 3615 188TH ST NW <br /> STANWOOD,WA,98292 STANWOOD,WA, 98292 t; <br /> JAN 2 5 2022 <br /> PHONE: PHONE: ARCHIVED <br /> TAX PARCEL ID#:00451500300102 SITE ADDRESS:3531 NORTO <br /> DESCRIPTION:SITE DEVELOPMENT FOR NEW <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications for <br /> Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 09/18/2019.Approved plans must remain on <br /> job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all required <br /> inspections.Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan.Remove upon completion of the project <br /> prior to final approval of the permit. <br /> 7. Keep City streets clean at all times.No dirt,mud,rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on-site in a <br /> manner that does not adversely affect neighboring properties,including the City's right-of-way and/or easements and the improvements located <br /> therein. <br /> 10.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy.Request a final inspection online by selecting PW <br /> 24-Site Final within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br /> 11. All work constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever requires use of the <br /> right-of-way for municipal purposes. <br /> 12. Site work shall be in conformance with the recommendations of the Geotechnical Engineering Study prepared by Geo Group Northwest,Inc., <br /> dated 4.3.2019. <br /> Public Works Permit Fee Breakdown: <br /> Erosion Control $50.00 <br /> Grade/Fill/Excavate(220CY)....... $74.00 t -2 Driveway Apron(Residential) $25.00g.51c,,17-'') <br /> Misc.Minor Permits(Drainage Work) $25.00 OCT 2019 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 <br /> Stormwater System Development Fee.......$775.70 CITY OF EVERETT <br /> Permit Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless <br /> the City of Everett from any and all claims for damages,costs,expenses,or <br /> �g (� causes of action that may arise because of installation and maintenance of <br /> 'e improvement or other right-of-way use here to applied for and further <br /> Approved for Construction(Public Works) Date agre• to remove same upon notice from the City and to replace public <br /> pert damage,tAreb,. <br /> bc+21 <br /> FINAL INSPECTION Date <br /> Approved as Constructed(PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />