Laserfiche WebLink
• <br /> WAC 296-46B-900 ELECTRICAL PLAN REVIEW <br /> DIRECTIONS: Read the WAC section below to determine if plan review is required or not required.Then select the box next to(a)to <br /> tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-46B-900. If plan review is <br /> required,select the box next to(b)and(c)to acknowledge that plan review is required and the electrical plans have been provided <br /> with this permit application. <br /> *If item(a)-(ii, iii,or v)is selected,the work must also comply with section(a)-(vii). See arrow flow chart below. <br /> (3)Electrical plan review, <br /> E✓ (a)Electrical plan review is not reoutred for: <br /> (i)Low voltage systems; <br /> - (ii)Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> (iii)Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> involved in the project,provided there is not a corresponding increase in the available fault current in any feeder.. <br /> _ (iv)Stand-alone utility fed services that do not exceed 250 volts,400 amperes where the project's distribution syste,, <br /> -- does not include: <br /> (A)Emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (8)An essential electrical system defined in NEC 517.2;or <br /> (C)A required fire pump system. <br /> ✓) (v)Modifications to existing electrical installations where all of the following conditions are met: <br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground; <br /> (B)Does not involve emergency systems other than listed unit equipment per NEC 700,12(F); <br /> (C)Does riot involve branch circuits or feeders of an essential electrical system as defined in NEC 511,2, <br /> and <br /> (D)Service or feeder load calculations are increased by 5%or less, <br /> (vi)Electric power production source(s)such as solar photovoltaic,fuel cell,or wind electric system(s)with a total <br /> rating of 9600 watts or less, <br /> (vii)For installations in(a)(ii),(iii),and (v)of this subsection to be considered,the following must be available <br /> to the electrical inspector before the work is initiated: <br /> (A)A clear and adequate description of the project's scope; <br /> (B)A load calculation(s); <br /> (C)What the load changes are, providing both before and after panel schedules as needed;and <br /> (D)Provide information showing that the service and feeder(s)supplying the panel(s)where the work is <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection <br /> for that supply, <br /> NOTE:Electrical plan review is not required for"Medical,dental,and chiropractic clinic"of which is a clinic or <br /> physicians'office where patients are not regularly kept as bed patients for twenty-four hours or more,per section <br /> (1)(c)(xii). <br /> (b)Electrical plan review is required for all other new or altered electrical projects in educational,institutional,or health care <br /> occupancies defined in this chapter. <br /> 0 (c)If a review is required, the electrical plan must be submitted for review and approval before the electrical work is begun. <br /> Table aoo.i Table 900-2 <br /> health or P?rsonal Care racdiUeS Educational and Institutional Facilities.Places of Assembly,or Other Facilities <br /> i Health or Personal Care tactful, Plan ReV14.ve <br /> ry v< ttaa}u�rar! Educational,Institutional.or `Plan Rev1ew <br /> Other Facility Types .,..Retlirired <br /> a -1_ vef <br /> a :at tr'srtanr' ±: ni4o.1a eek Notes to Tables 900-1 and 900.2. <br /> - 7,0 4,W.€fro t _....... ea �^ a t_ ,p".e�1±,e .st,ra;: (• <br /> w^. <br /> € 3$al•'t8$.:,..,....., '3`` _,. - Y anbyI 3-41?" ,'xS i42 t,t.ems. ,{ <br /> 4.414:etrfp YtR 44, yt t•«,,. 4s. L.44.44 `,t„r' 4'44tt':: <br /> etia $ T.-3 }f. <br /> PERMIT# Page 2-Plan Review <br />