Laserfiche WebLink
a <br />a <br />vl <br />a <br />n <br />5' 5' <br />PLANTER <br />PDX (TYP.) <br />I / <br />! <br />I\ <br />I \ <br />I / <br />I <br />I <br />I <br />I � <br />CAUI1., <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, <br />DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE <br />PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL <br />AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE <br />CALLING UTILITY LOCATE @ 1-800-424-5555 POTHOLING ALL OF THE EXISTING <br />UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY <br />WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN <br />ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND <br />ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR <br />SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL <br />PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. <br />05 <br />I, a , T. 2 a9 a jeg o s <br />SNOHOMISH COUNTY, WASHINGTON <br />1 / I <br />I / I <br />/ I <br />------------------------------- �f--------------------------------------- --- --- =1 <br />T SC & GRADING NOTES <br />1. <br />THE TEMPORARY EROSION CONTROL SYSTEM SHALL BE INSTALLED PRIOR TO ALL <br />OTHER CONSTRUCTION, <br />2. <br />WHERE POSSIBLE, MAINTAIN NATURAL VEGETATION FOR SILT CONTROL. <br />3. <br />AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE, THE <br />{ � <br />EROSION CONTROL FACILITIES SHALL BE MAINTAINED AND/OR ALTERED AS <br />REQUIRED BY THE CITY ENGINEER TO ENSURE CONTINUING <br />i� <br />EROSION/SEDIMENTATION CONTROL. <br />C j 4. <br />ALL DISTURBED AREAS THAT WILL BE LEFT FOR 30 DAYS OR MORE DURING THE <br />a <br />PERIODS OF MARCH 1 TO MAY 15 AND AUGUST 15 TO OCTOBER I SHALL BE <br />IMMEDIATELY SEEDED WITH A MIX AND BY A METHOD APPROVED BY THE CITY OF <br />EVERETT PUBLIC WORKS DEPARTMENT AND MAINTAINED UNTIL SEED GERMINATION <br />IS ASSURED. IN ADDITION TO SEEDING, SLOPES OF 25% OR GREATER WILL BE <br />MULCHED WITH 2.0 TONS OF STRAW PER ACRE, OR WITH AN APPROVED EQUAL. <br />DURING THE REST OF THE YEAR, TEMPORARY SOIL STABILIZATION MUST BE <br />— — — — — — — — - <br />APPLIED IMMEDIATELY TO DISTURBED AREAS THAT WILL BE LEFT EXPOSED FOR 7 <br />DAYS OR MORE, AND IMMEDIATELY TO SLOPES GREATER THAN 25% WILL BE LEFT <br />EXPOSED FOR 3 DAYS OR MORE. <br />5. <br />THE PUBLIC RIGHT-OF-WAY SHALL BE KEPT CLEAN. TRACKING OF MUD AND <br />DEBRIS FROM THE SITE WILL NOT BE ALLOWED. FAILURE TO COMPLY WITH THIS <br />CONDITION WILL RESULT IN ALL WORK ON THE SITE BEING STOPPED. <br />6. <br />GRADING OUTSIDE CITY RIGHT-OF-WAY SHALL CONFORM TO CHAPTER 70, <br />UNIFORM BUILDING CODE. <br />7. <br />COMPACT ALL FILLS TO MINIMUM 95% MAXIMUM DENSITY. <br />8. <br />THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION <br />COLLECTION FACILITIES TO INSURE THAT SEDIMENT -LADEN WATER DOES NOT <br />ENTER THE NATURAL DRAINAGE SYSTEM. AS CONSTRUCTION PROGRESSES AND <br />l <br />UNEXPECTED (SEASONAL) CONDITIONS DICTATE, MORE SILTATION CONTROL <br />FACILITIES MAY BE REQUIRED TO INSURE COMPLETE SILTATION CONTROL OF THE <br />— — — — — — — — — _ <br />PROPOSED PROJECT. THEREFORE, DURING THE COURSE Of' CONSTRUCTION IT <br />SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO <br />ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO <br />PROVIDE ADDITIONAL FACILITIES THAT MAY BE NEEDED TO PROTECT ADJACENT <br />PROPERTIES. <br />{ 9. <br />CONTRACTOR SHALL PROTECT THE SEWER MAIN DURING CONSTRUCTION. <br />ESC NOTES <br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN <br />APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, <br />PIPES RESTRICTORS CHANNELS RETENTION FACILITIES UTILITIES <br />— — — — — — — — — - <br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, <br />REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE <br />— <br />% %� <br />APPLICNTICONTRACTOR UT fTRUCTION IS COMPLETED AND APPROVED AND <br />/ / <br />VEGETAT ION/LANDSCAPINGSESTABLISHED. <br />/ <br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY <br />/ <br />FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO <br />r <br />DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED, THE FLAGGING <br />SHALL BE MAINTAINED BY THE APPLICANTICONTRACTOR FOR THE DURATION <br />OF CONSTRUCTION. <br />/ <br />/ <br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL <br />CLEARING AND GRADING ACTIVITIES, <br />AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND <br />SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE <br />/ <br />APPLICABLE WATER QUALITY STANDARDS. <br />(/ <br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED <br />f / ,��/_Z <br />SITE CONDITIONS, DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE <br />UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND <br />SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE. <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE <br />APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM <br />EVENTS. <br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF <br />{ <br />ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT <br />8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A <br />TRAPPED CATCH ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO <br />PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE <br />DOWNSTREAM SYSTEM. <br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL 3E INSTALLED AT THE BEGINNING OF <br />CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT ADDITIONAL MEASURES <br />MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF <br />THE PROJECT. <br />10 THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT <br />— — — — — — — — - <br />TRACKED OFF THE SITE. <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER <br />BODIES IF THE PROPOSED BMPS FAIL. <br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABR_IZED FOR NO <br />MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS <br />FROM MAY 1 THROUGH SEPTEMBER 30. <br />10 5 0 10 20 <br />THE 13 ELEMENTS OF TSO <br />ELEMENT JI - MARK CLEARING LIMITS: <br />LIMIT OF CONSTRUCTION ARE CLEARLY MARKED. <br />BMP C103 <br />ELEMENT J2 - ESTABLISH CONSTRUCTION ACCESS: <br />THE EXISTING PAVED ENTRANCE WILL FUNCTION AS THE STABILIZED <br />CONSTRUCTION ENTRANCE. <br />ELEMENT J3 - CONTROL FLOW RATES: <br />FLOW IS MINIMAL. <br />NO BMP's ARE PROPOSED. <br />ELEMENT 14 - INSTALL SEDIMENT CONTROLS: <br />NO BMP'S ARE PROPOSED <br />ELEMENT J5 - STABILIZE SOILS: <br />SOIL STABILIZATION 1S ACHEIVED BY PLASTIC COVERING, MULCHING & SEEDS <br />ELEMENT J6 - PROTECT SLOPES: <br />N/A <br />NO BMP's ARE PROPOSED. <br />ELEMENT J7- PROTECT DRAIN INLETS: <br />NO BMP'S ARE PROPOSED. <br />ELEMENT#8 - STABILIZE CHANNELS AND OUTLETS: <br />N/A. <br />NO BMP's ARE PROPOSED, <br />ELEMENT J9 - CONTROL POLLUTANTS: <br />ALL VEHICLES, EQUIPMENT AND PETROLEUM PRODUCT STORAGE/DISPERSING AREAS <br />WILL BE INSPECTED REGULARLY TO DETECT ANY LEAKS OF SPILLS, AND TO <br />IDENTIFY MAINTENANCE NEEDS AND PREVENT LEAKS OF SPILLS. <br />BMP's C 151, C 152 & C 153, <br />ELEMENT JIO - CONTROL DEWATERING: <br />THERE WILL BE NO DEWATERING AS PART OF THIS CONSTRUCTION PROJECT. <br />NO BMP's ARE PROPOSED. <br />ELEMENT #11- MAINTAIN BMPs: <br />ALL TEST BMPs SHALL BE MAINTAINED AND REPAIRED AS NEEDED, <br />BMP's C 150 & C 160. <br />ELEMENT #12 - MANAGE THE PROJECT: <br />THIS COULD BE ACHIEVED BY MINIMIZING THE EXTENT AND DURATION OF THE AREA <br />EXPOSED AND BY EMPHASIZING EROSION CONTROL THEN SEDIMENT CONTROL. <br />BMP's C 105, C 160 & C 162. <br />ELEMENT #13 - PROTECT ON -SITE STORMWATER MANAGEMENT BMP°S FOR RUNOFF <br />FROM ROOFS AND OTHER HARD SURFACES: <br />N/A <br />f CONTRACTOR RESRONSIBITITYFOR 1;R0510-NISITTATI0IV C'ONTROT <br />( IT IS THE INTENT OF THIS TEMPORARY EROSION AND SILTATION CONTROL PLAN THAT STORM WATER RUNOFF BE <br />CONTROLLED AT ALL TIMES TO PREVENT SOIL EROSION AND TO MAINTAIN WATER QUALITY. ANY AND ALL <br />MEASURES NECESSARY TO DO SO SHALL BE EMPLOYED BY THE CONTRACTOR. <br />I. REGARDLESS OF SITE, WEATHER, SOIL OR OTHER CONDITIONS, THE CONTRACTOR SHALL BE FULLY <br />_ — — — — — — — — — - RESPONSIBLE FOR ENSURING THAT EROSION DOES NOT OCCUR ON THE SITE AND THAT POLLUTED OR <br />�En , SILT -LADEN RUNOFF DOES NOT LEAVE THE SITE OR ENTER INTO ANY CREEK, STREAM, WETLAND OR <br />WATER BODY ON THE SITE. <br />2. BEYOND THE MINIMUM REQUIREMENTS SHOWN ON THIS PLAN, THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR SELECTING AND IMPLEMENTING APPROPRIATE METHODS, "BEST MANAGEMENT PRACTICES" (BMPs), FOR <br />I STORM WATER TREATMENT AND CONTROL THAT MEET THE REQUIREMENTS OF BOTH THE WASHINGTON STATE <br />DEPARTMENT OF ECOLOGY AND THE CITY OF EVERETT. <br />C) 3, THE CONTRACTOR SHALL REPORT ALL WATER QUALITY CONCERNS AND ACTIVITIES TO THE PROJECT ENGINEER <br />AND THE CITY INSPECTOR. IN THE EVENT THAT THE INSTALLED WATER QUALITY CONTROL MEASURES ARE <br />UU) INEFFECTIVE AT CONTROLLING EROSION AND SILTATION, THE CONTRACTOR .SHALL IMMEDIATELY REPORT TO <br />AND CONSULT WITH THE PROJECT ENGINEER TO FIND AN APPROPRIATE REMEDY. ALL CONSTRUCTION <br />ACTIVITIES, WITH THE EXCEPTION OF EROSION AND SILTATION CONTROL MEASURES, SHALL CEASE UNTIL <br />SUCH TIME AS THE WATER QUALITY IS BROUGHT UNDER CONTROL. <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING WEATHER FORECASTS AND ANTICIPATING STORM <br />{ ACTIVITY AND SHALL SCHEDULE ALL PROJECT ACTIVITIES IN ANTICIPATION OF THE WEATHER. <br />i — — — — -- — — — — - 5. ALL SUPPLIES AND MATERIALS NECESSARY FOR IMPLEMENTING BMPs SHALL BE STORED ON SITE AND SHALL <br />U BE IMMEDIATELY AVAILABLE FOR USE. SUCH SUPPLIES AND MATERIALS SHALL INCLUDE BUT NOT BE LIMITED <br />TO, STRAW BALES OR OTHER MULCHING MATERIAL, SILT FENCING AND STAKES, FILTER FABRIC, ETC. <br />6. DURING AND AFTER RUNOFF PRODUCING STORM EVENTS, CONTRACTOR SHALL MONITOR ALL EROSION <br />CONTROL MEASURES AND SHALL PRIORITIZE IMPLEMENTATION AND MAINTENANCE OF EROSION AND SILTATION <br />CONTROL MEASURES ABOVE ALL OTHERS. <br />CITY OF EVERETT <br />REVIEWED FOR PERMIT <br />