My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Port of Everett 1/3/2022
>
Contracts
>
Agreement
>
Interlocal Agreements
>
Port of Everett 1/3/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:12 AM
Creation date
2/18/2022 8:54:19 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Port of Everett
Approval Date
1/3/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr/Tim Benedict
Subject / Project Title
Norton Terminals
Public Works WO Number
UP3768
Tracking Number
0003194
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEMPORARY CONSTRUCTION <br /> LICENSE AGREEMENT <br /> THIS TEMPORARY CONSTRUCTION LICENSE AGREEMENT(this"Agreement")is <br /> made and entered into as of , 20_, by and between Port of Everett, a Washington <br /> port district(the "Port"), and City of Everett, a Washington municipal corporation (the "City"). <br /> The Port and the City are referred to herein individually as a "Party" and collectively as the <br /> "Parties." <br /> RECITALS <br /> A. The Port owns certain real property, which is located in the City of Everett, <br /> Snohomish County,Washington,as legally described on attached Exhibit A(the"Port Property"). <br /> B. The City owns certain real property located adjacent to the Port Property, which is <br /> located in the City of Everett, Snohomish County, Washington, as legally described on attached <br /> Exhibit B (the"City Property"). <br /> C. The City intends to construct a 42-inch diameter sewer line, a 12-inch diameter <br /> force main,and associated improvements(the"City Improvements"),over and across a portion of <br /> the Port Property. The City Improvements will be constructed by the City's contractors within a <br /> vertical trench approximately twenty feet deep and twelve feet wide(the "Utility Trench"). <br /> D. In order to construct the City Improvements, the City needs a temporary <br /> construction license over those portions of the Port Property described and depicted as"Licensed <br /> Area" in Exhibit C attached hereto (the"License Area"). <br /> E. The Port will be constructing its own improvements(the"Port Improvements")on <br /> the Port Property, concurrently with the City's construction of the City Improvements. <br /> F. This Agreement is one of the agreements authorized by an Interlocal Agreement <br /> between the City and the Port, with respect to certain matters related to the Port Property (the <br /> "Interlocal Agreement"). The Interlocal Agreement authorizes several agreements, including a <br /> separate environmental indemnification agreement with respect to potential claims and other <br /> matters related to the environmental site conditions of the Port Property (the "Environmental <br /> Indemnification Agreement"). For purposes of this Agreement, the term "Hazardous <br /> Substances" shall have the meaning ascribed to such term in the Environmental Indemnification <br /> Agreement. <br /> AGREEMENT <br /> NOW, THEREFORE, for and in consideration of the terms and conditions of this <br /> Agreement and the Recitals described above,which are incorporated herein, as well as the mutual <br /> benefits to be derived herefrom, the Parties agree as follows: <br /> 1. Grant of Temporary License. Subject to the terms and conditions of this <br /> Agreement, the Port hereby grants and conveys to the City a temporary, non-exclusive license <br /> - 1 - <br /> 112558540.10 0073013-00041 <br />
The URL can be used to link to this page
Your browser does not support the video tag.