Laserfiche WebLink
18. During construction and in an effort to maintain public communications,the City shall <br /> coordinate with the Port's Public Communications Director, Catherine Soper, on all <br /> public communications associated with the Pipeline project. <br /> 19. All haul road material imported by the City must be removed from the Port Property prior <br /> to the expiration of the Term of this Agreement. <br /> 20. The Port may implement dust monitoring equipment to verify that there is no fugitive <br /> dust leaving the limits of the work area, in excess of the Washington State's Ambient Air <br /> Quality Standards,which define a 24-average concentration of 150 micrograms per cubic <br /> meter of air(150 ug/m3) for PM-10 (WAC 173-476-100). If the measured levels of dust <br /> (PM-10)are found to exceed 150 ug/m3,the Work will stop until the dust levels are <br /> eliminated or fall below 150 ug/m3. <br /> Exhibit E <br /> 112558540.10 0073013-00041 <br />